PLANETARY GEARS WITH INTEGRATED OVERLOAD PROTECTION FACILITIES FOR PLOUGH SYSTEMS.

被引:0
|
作者
Seeliger, Andreas [1 ]
Meiselbach, Bernd [1 ]
机构
[1] Westfaelische Bergewerkschaftskasse, Westfaelische Bergewerkschaftskasse
来源
Gluckauf. With English translation Essen | 1987年 / 123卷 / 15期
关键词
DRIVES; -; GEARS;
D O I
暂无
中图分类号
学科分类号
摘要
German coal mining is under pressure to make coal extraction more cost-effective and efficient. This is resulting in cutting being concentrated at ever fewer faces and thereby the necessity of increasing the drive output of the winning and conveyor systems accordingly. The reliability of planetary gears has been proven in numerous underground applications, mainly in conveyor systems. Specific development of these planetary gear drives then led to versions with integrated overload protection for use in plough installations. The first system of this type, manufactured by the Dorstener Maschinenfabrik AG, in the form of a two-stage concentric planetary gear has come through its trial period in ten months of use at the Fuerst Leopold mine.
引用
收藏
页码:404 / 407
相关论文
共 50 条
  • [31] OVERLOAD PROTECTION FOR INTEGRATED LINE VOLTAGE STABILIZERS.
    Buzykin, S.G.
    Nedoluzhko, I.G.
    Telecommunications and Radio Engineering (English translation of Elektrosvyaz and Radiotekhnika), 1978, 32-33 (11): : 42 - 45
  • [32] Unification of Automatic Control Facilities of Complex Electromechanical Systems.
    Petukhov, V.I.
    Chulkov, I.V.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Elektromekhanika, 1974, (07): : 774 - 780
  • [33] HUMAN ASPECTS IN INTEGRATED MANUFACTURING SYSTEMS.
    Salvendy, Gavriel
    International Journal of Production Research, 1985, 24 (04) : 749 - 762
  • [34] Integrated systems. Changing the face of distribution
    Lewis, David
    Process and Control Engineering, 1993, 46 (05):
  • [35] Information Distribution in Integrated Production Systems.
    Hellwig, Horst-E.
    Paulus, Manfred
    VDI-Z, 1986, 128 (1-2): : 1 - 12
  • [36] Integrated control systems. The next step
    Smith, Douglas J.
    Power Engineering (Barrington, Illinois), 1991, 95 (09): : 17 - 21
  • [37] ECONOMIC EVALUATION OF INTEGRATED REACTOR SYSTEMS.
    Ingleby, S.
    Rossiter, A.P.
    Douglas, J.M.
    Chemical Engineering Research and Design, 1986, 64 (04) : 241 - 247
  • [38] MODERN INTEGRATED BROKE HANDLING SYSTEMS.
    Barfod, H.
    Pulp and Paper Canada, 1986, 87 (05): : 72 - 76
  • [39] Integrated load simulation for exhaust systems.
    Kutka, H
    Schnattinger, H
    MATERIALPRUFUNG, 1999, 41 (06): : 228 - 232
  • [40] HIERARCHICAL CONTROL OF INTEGRATED MANUFACTURING SYSTEMS.
    Cassinis, Riccardo
    Technical Paper - Society of Manufacturing Engineers. MS, 1983,