共 50 条
- [32] Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 163 - 167
- [38] Feasibility Analysis and Optimization for Turbo-Generator Rushing with Non-Nuclear Steam in Fuqing Nuclear Power Plant 2018, Atomic Energy Press (39): : 122 - 127
- [40] Second law based analysis of Supplementary Firing Effects on the Heat Recovery Steam Generator in a combined cycle power plant PROCEEDINGS OF THE ASME 10TH BIENNIAL CONFERENCE ON ENGINEERING SYSTEMS DESIGN AND ANALYSIS, 2010, VOL 1, 2010, : 201 - 209