共 50 条
- [15] Slashing process times with single lift and set-up AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2003, 75 (05): : 524 - 526
- [16] CONTROLLING AND RECORDING PRODUCTION AND SET-UP TIMES AUTOMATICALLY F&M-FEINWERKTECHNIK & MESSTECHNIK, 1989, 97 (10): : 430 - 432
- [19] The flexible blocking job shop with transfer and set-up times Journal of Combinatorial Optimization, 2011, 22 : 121 - 144