Test results of the two-circuit scheme for hot-water boiler switching

被引:0
|
作者
Shchetkin, V.S. [1 ]
机构
[1] ORGRES, Sankt-Peterburg, Russia
来源
Teploenergetika | 1993年 / 04期
关键词
Deposits - Desalination - District heating - Flow of water - Heat exchangers - Hydraulics - Operations research - Reliability - Schematic diagrams - Water;
D O I
暂无
中图分类号
TM62 [发电厂];
学科分类号
摘要
Results of prolonged tests (during three heating seasons) of a hot-water boiler PTWM-180 are described. The boiler was connected with a district heating system through water-water heat exchangers. The connection scheme permits in boiler operation with chemically desalted water to provide reliable operation of the boiler during a prolonged period. After connection of the hot-water boiler into a two-circuit scheme and operation during three heating seasons the internal deposits on the boiler heating surfaces were not more than 200 mg/m2. The improvement of water-chemistry boiler operation due to water cleaning is determined by technical and economical calculations.
引用
收藏
页码:36 / 42
相关论文
共 50 条
  • [1] ANALYSIS OF TEST RESULTS OF HOT-WATER BOILER AS A BASIS FOR ITS INTEGRITY ASSESSMENT
    Zeravcic, Vera Sijacki
    Bakic, Gordana
    Djukic, Milos B.
    Andelic, Biljana
    STRUCTURAL INTEGRITY AND LIFE-INTEGRITET I VEK KONSTRUKCIJA, 2007, 7 (02): : 133 - 140
  • [2] Operational conditions for a PTVM-180 water heating boiler incorporated into a two-circuit flowchart
    Shchetkin, V.S.
    Petrov, I.V.
    Teploenergetika, 1992, (01): : 23 - 26
  • [3] The optimization of design of fire-tube shell hot-water boiler
    Naumejko, A.V.
    Ryzhkov, A.F.
    Gofman, M.S.
    Dejnezhenko, V.I.
    Promyshlennaya Energetika, 2002, (10): : 37 - 41
  • [4] Hot-Water Use in Hotels: Part 2-Travel Hotel Hot-Water System Monitoring Results
    Hiller, Carl C.
    Johnson, Russell
    ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 395 - 408
  • [5] Hot-Water Use in Hotels: Part 3-Business Hotel Hot-Water System Monitoring Results
    Hiller, Carl C.
    Johnson, Russell
    ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 409 - 421
  • [6] Comparison of two numerical approaches to the domestic hot water circuit in a combi boiler appliance
    Atmaca, Aye Ugurcan
    Erek, Aytunc
    Altay, Hurrem Murat
    ENERGY AND BUILDINGS, 2016, 127 : 1043 - 1056
  • [7] Development of energy-efficient hot-water boiler for block-modular boiler house of Transneft
    Revel-Muroz, Pavel A.
    Kopysov, Andrey F.
    Proskurin, Yury V.
    Grisha, Bronislav G.
    Ilyina, Marina N.
    Roslyakov, Pavel V.
    Ionkin, Igor L.
    NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2018, 8 (02): : 180 - 187
  • [8] Development of energy-efficient hot-water boiler for block-modular boiler house of Transneft
    Revel-Muroz, Pavel A.
    Kopysov, Andrey F.
    Proskurin, Yury V.
    Grisha, Bronislav G.
    Ilyina, Marina N.
    Roslyakov, Pavel V.
    Ionkin, Igor L.
    NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2018, 8 (07): : 784 - 791
  • [9] Experimental and numerical study of the characteristics of biomass suspension combustion in a hot-water boiler
    Zhang, Pin
    Liu, Shengyong
    He, Chao
    Tao, Hongge
    Qing, Chunyao
    Li, Pengfei
    Li, Dongdong
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2018, 10 (03)
  • [10] Hot-Water Distribution System Piping Time, Water, and Energy Waste-Phase III: Test Results
    Hiller, Carl C.
    ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 742 - 754