共 50 条
- [1] ANALYSIS OF TEST RESULTS OF HOT-WATER BOILER AS A BASIS FOR ITS INTEGRITY ASSESSMENT STRUCTURAL INTEGRITY AND LIFE-INTEGRITET I VEK KONSTRUKCIJA, 2007, 7 (02): : 133 - 140
- [2] Operational conditions for a PTVM-180 water heating boiler incorporated into a two-circuit flowchart Teploenergetika, 1992, (01): : 23 - 26
- [3] The optimization of design of fire-tube shell hot-water boiler Promyshlennaya Energetika, 2002, (10): : 37 - 41
- [4] Hot-Water Use in Hotels: Part 2-Travel Hotel Hot-Water System Monitoring Results ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 395 - 408
- [5] Hot-Water Use in Hotels: Part 3-Business Hotel Hot-Water System Monitoring Results ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 409 - 421
- [7] Development of energy-efficient hot-water boiler for block-modular boiler house of Transneft NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2018, 8 (02): : 180 - 187
- [8] Development of energy-efficient hot-water boiler for block-modular boiler house of Transneft NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2018, 8 (07): : 784 - 791
- [10] Hot-Water Distribution System Piping Time, Water, and Energy Waste-Phase III: Test Results ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 742 - 754