Mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines

被引:0
|
作者
Cerda, Jaime [1 ]
Henning, Gabriela P. [1 ]
Grossmann, Ignacio E. [1 ]
机构
[1] Universidad Nacional del Litoral, Santa Fe, Argentina
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1695 / 1707
相关论文
共 50 条
  • [31] Task Scheduling for Multiunit Parallel Test Using Mixed-Integer Linear Programming
    Yang, Zhao
    Xiao, Han-Shan
    Guan, Rui
    Yang, Yang
    Ji, Hong-Liang
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [32] Discrete-time mixed-integer programming models for short-term scheduling in multipurpose environments
    Lee, Hojae
    Maravelias, Christos T.
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 107 : 171 - 183
  • [33] Task Scheduling for Multiunit Parallel Test Using Mixed-Integer Linear Programming
    Yang, Zhao
    Xiao, Han-Shan
    Guan, Rui
    Yang, Yang
    Ji, Hong-Liang
    Mathematical Problems in Engineering, 2021, 2021
  • [34] A mixed-integer linear programming scheduling optimization model for refinery production
    Zheng, Zhekui
    Zhang, Hongjing
    Chemical Engineering Transactions, 2016, 51 : 907 - 912
  • [35] Mixed-integer linear programming model for gasoline blending and distribution scheduling
    Jia, ZY
    Ierapetritou, M
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (04) : 825 - 835
  • [36] A Mixed-Integer Linear Programming Scheduling Optimization Model for Refinery Production
    Zheng, Zhekui
    Zhang, Hongjing
    3RD INTERNATIONAL CONFERENCE ON APPLIED ENGINEERING, 2016, 51 : 907 - 912
  • [37] A mixed-integer linear programming scheduling optimization model for refinery production
    Zheng, Zhekui (zhekuizheng@126.com), 2016, Italian Association of Chemical Engineering - AIDIC (51):
  • [38] Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
    Chang, GW
    Aganagic, M
    Waight, JG
    Medina, J
    Burton, T
    Reeves, S
    Christoforidis, M
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) : 743 - 749
  • [39] Efficient short-term scheduling of multiproduct batch plants under demand uncertainty
    Zhu, Jin
    Gu, Xingsheng
    Jiao, Bin
    PROGRESS IN NATURAL SCIENCE-MATERIALS INTERNATIONAL, 2008, 18 (04) : 487 - 493