Research on multi-agent-based scheduling approach for job scheduling

被引:0
|
作者
Rao, Yunqing
Xie, Chang
Li, Shuxia
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
No abstract available
引用
收藏
相关论文
共 50 条
  • [21] An effective multi-agent-based graph reinforcement learning method for solving flexible job shop scheduling problem
    Wan, Lanjun
    Fu, Long
    Li, Changyun
    Li, Keqin
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2025, 139
  • [22] Multi-agent-based dynamic scheduling method for semiconductor wafer fabrication facilities
    College of Electronics and Information Engineering, Tongji University, Shanghai 200092, China
    Qinghua Daxue Xuebao, 2007, SUPPL. 2 (1895-1898):
  • [23] Multi-agent-based model for task scheduling in virtual enterprise and its optimization
    Institute of System Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
    不详
    Kong Zhi Li Lun Yu Ying Yong, 2009, 4 (459-462):
  • [24] A multi-agent-based negotiation approach for parallel machine scheduling with multi-objectives in an electro-etching process
    Huang, Ching-Jen
    Liao, Li-Man
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5719 - 5733
  • [25] A Decentralized Multi-agent Approach to Job Scheduling in Cloud Environment
    Gasior, Jakub
    Seredynski, Franciszek
    INTELLIGENT SYSTEMS'2014, VOL 1: MATHEMATICAL FOUNDATIONS, THEORY, ANALYSES, 2015, 322 : 403 - 414
  • [26] A multi-agent-based system for two-stage scheduling problem of offshore project
    Han, Duanfeng
    Yang, Boxin
    Li, Jinghua
    Wang, Jiaxuan
    Sun, Miaomiao
    Zhou, Qinghua
    ADVANCES IN MECHANICAL ENGINEERING, 2017, 9 (10):
  • [27] Multi-agent-based hierarchical collaborative scheduling in re-entrant manufacturing systems
    Zhang, Jie
    Wang, Xiaoxi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (23) : 7043 - 7059
  • [28] Multi-agent-based scheduling methods for hybrid cellular production lines in semiconductor industry
    Kim, Jungyun
    Chung, Seong Youb
    Yoon, Hyun Joong
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2014, 228 (12) : 1701 - 1712
  • [29] Multi machine scheduling: An agent-based approach
    Akkiraju, R
    Keskinocak, P
    Murthy, S
    Wu, F
    FIFTEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE (AAAI-98) AND TENTH CONFERENCE ON INNOVATIVE APPLICATIONS OF ARTIFICAL INTELLIGENCE (IAAI-98) - PROCEEDINGS, 1998, : 1013 - 1019
  • [30] Job Shop Dynamic Scheduling Model Based on Multi-Agent
    He, Li
    Liu, Yong-xian
    Xie, Hua-long
    Zhang, Yu
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 829 - +