Two new barrier pillar design methods for longwall mining

被引:0
|
作者
Majdi, A. [1 ]
Hassani, F.P. [1 ]
Cain, P. [1 ]
机构
[1] Society of the Energy of James Bay, LAI, Canada
来源
Mining science & technology | 1991年 / 13卷 / 03期
关键词
14;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:323 / 336
相关论文
共 50 条
  • [31] A Study on the Impact of Longwall-Mining Operation on the Stability of a Slope-Pillar Structure
    Bai, Wenyong
    Zhang, Jie
    Wang, Bin
    Zhang, Jianchen
    Li, Hongru
    Yang, Sen
    SHOCK AND VIBRATION, 2021, 2021
  • [32] Numerical investigation into effect of rear barrier pillar on stress distribution around a longwall face
    Ju Ming-he
    Li Xue-hua
    Yao Qiang-ling
    Li Dong-wei
    Chong Zhao-hui
    Zhou Jian
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (11) : 4372 - 4384
  • [33] Long-term stability evaluation and coal pillar design methods for strip mining
    Yu Y.
    Deng K.
    Fan H.
    Meitan Xuebao/Journal of the China Coal Society, 2017, 42 (12): : 3089 - 3095
  • [34] Design of a longwall mining system in a jointed rock mass
    Coal Int (Redhill Engl), 4 (2 pp):
  • [35] Investigating different methods used for approximating pillar loads in longwall coal mines
    Deniz Tuncay
    Ihsan Berk Tulu
    Ted Klemetti
    InternationalJournalofMiningScienceandTechnology, 2021, 31 (01) : 23 - 32
  • [36] Investigating different methods used for approximating pillar loads in longwall coal mines
    Tuncay, Deniz
    Tulu, Ihsan Berk
    Klemetti, Ted
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2021, 31 (01) : 23 - 32
  • [37] Longwall Mining Automation – The Shearer Positioning Methods between the Longwall Automation Steering Committee and China University of Mining and Technology
    Dai, Weiwei
    Wang, Shibo
    Wang, Shijia
    Coal International, 2024, 272 (06): : 14 - 26
  • [38] Optimization of gob ventilation boreholes design in longwall mining
    Saki, Saqib Ahmad
    Brune, Jurgen F.
    Khan, Muhammad Usman
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (06) : 811 - 817
  • [39] Optimization of gob ventilation boreholes design in longwall mining
    Saqib Ahmad Saki
    Jürgen F.Brune
    Muhammad Usman Khan
    InternationalJournalofMiningScienceandTechnology, 2020, 30 (06) : 811 - 817
  • [40] Numerical Investigation of the Dynamic Mechanical State of a Coal Pillar During Longwall Mining Panel Extraction
    Hongwei Wang
    Yaodong Jiang
    Yixin Zhao
    Jie Zhu
    Shuai Liu
    Rock Mechanics and Rock Engineering, 2013, 46 : 1211 - 1221