Sawmills. List construction timber efficient, just-in-time manufacture

被引:0
|
作者
机构
来源
Holz - Kurier | 2000年 / 55卷 / 34期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:8 / 9
相关论文
共 38 条
  • [31] Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
    Hussein, Mohamed
    Zayed, Tarek
    JOURNAL OF CLEANER PRODUCTION, 2021, 284
  • [32] Lessons Learned from Developing and Testing an Augmented Reality Application for Just-in-Time Information Delivery to Improve Construction Safety
    Lakshminarayanan, Krithikashree
    Patel, Mayank Arvindbhai
    Din, Zia
    Song, Lingguang
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 229 - 245
  • [33] An efficient search algorithm for obtaining the optimal replenishment strategies in assembly-type just-in-time supply chain systems
    Yao, Ming-Jong
    Hsu, Tien-Cheng
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (02) : 118 - 128
  • [34] Parameter-efficient fine-tuning of pre-trained code models for just-in-time defect prediction
    Abu Talib M.
    Bou Nassif A.
    Azzeh M.
    Alesh Y.
    Afadar Y.
    Neural Computing and Applications, 36 (27) : 16911 - 16940
  • [35] An efficient search algorithm for obtaining the optimal replenishment strategies in assembly-type just-in-time supply chain systems
    Hsu, Tien-Cheng
    Yao, Ming-Jong
    Tseng, Tsueng-Yao
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 580 - 587
  • [36] A dynamic model of just-in-time logistics coordination to determine optimal transport combinations of recycled soils between construction project sites
    Tomita, Y
    Matsuo, M
    Hayashi, Y
    URBAN TRANSPORT AND THE ENVIRONMENT II, 1996, : 465 - 480
  • [37] ENVIRONMENTAL IMPACTS COMPARISON BETWEEN ON-SITE VS. PREFABRICATED JUST-IN-TIME (PREFAB-JIT) REBAR SUPPLY IN CONSTRUCTION PROJECTS
    Kim, Yong-Woo
    Azari-N, Rahman
    Yi, June-Seong
    Bae, Jinwoo
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (05) : 647 - 655
  • [38] Synchronization of ETO manufacturing and assembly on-site - Assembly oriented manufacturing and just-in-time supply for construction sites in engineer-to-order industrial enterprises
    Matt, Dominik T.
    Rauch, Erwin
    Dallasega, Patrick
    Vidoni, Renato
    Spena, Pasquale Russo
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (1-2): : 9 - 13