共 50 条
- [41] Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (10): : 3159 - 3162
- [43] Analysis of the Effects of Shallow Gas on a Shield Tunnel during Leakage: A Case Study from the Sutong River-Crossing GIL Utility Tunnel Project in China KSCE Journal of Civil Engineering, 2021, 25 : 2285 - 2299
- [45] Application of Pre-grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 1133 - +
- [46] Construction Techniques of Deep Diaphragm Wall in The Yellow River-Crossing Project in South-To-North Water Transfer ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 1212 - +
- [47] Technology Review System of Water-Temperature Prediction for Reservoir Construction Project INTERNATIONAL CONFERENCE ON ECOLOGICAL INFORMATICS AND ECOSYSTEM CONSERVATION (ISEIS 2010), 2010, 2 : 1979 - 1982
- [48] Study on Construction Risk Analysis and Risk Counter-measures of River-crossing Tunnel of Large-diameter Metro PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 2680 - +
- [49] Review of key construction techniques for extra-large diameter slurry shield crossing Yangtze River Chen, Jian, 1600, Editorial By Modern Tunnelling Technology, China (51):
- [50] Risk Analysis during Departure and Reception of Shield in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2125 - 2130