共 50 条
- [21] RTZ AND BP TERMINATE OLYMPIC DAM AGREEMENT E&MJ-ENGINEERING AND MINING JOURNAL, 1989, 190 (11): : 83 - 83
- [22] Sampling and measurements in the reaction shaft at Olympic Dam FIRST EXTRACTIVE METALLURGY OPERATORS' CONFERENCE, PROCEEDINGS, 2005, 2005 (09): : 87 - 93
- [23] Water management at BHP billiton Olympic dam AusIMM New Leaders' Conference 2006: RIDING THE BOOM. THE MINERALS INDUSTRY INTO TOMORROW, 2006, 2006 (02): : 89 - 94
- [24] Local government pushes Olympic Dam expansion E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (11): : 7 - 7
- [25] The mine management system at Olympic Dam mine MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 637 - 643
- [26] OLYMPIC-DAM - HEADING FOR 1988 STARTUP E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (11): : 36 - 38
- [27] Engineering the new Olympic Dam backfill system MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 721 - 734
- [28] FEASIBILITY STUDY SUPPORTS DEVELOPMENT OF OLYMPIC DAM E&MJ-ENGINEERING AND MINING JOURNAL, 1985, 186 (08): : 16 - &
- [29] Project to inspire Olympic hopefuls INTERNATIONAL GAS ENGINEERING AND MANAGEMENT, 2008, 48 (01): : 33 - 33
- [30] MANGLA DAM PROJECT PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1967, 36 (JAN): : 213 - &