Engineering initiative helps solve beach problem in Port Elizabeth

被引:0
|
作者
Anon
机构
来源
Civil engineer in South Africa | 1991年 / 33卷 / 06期
关键词
Hobie Beach;
D O I
暂无
中图分类号
学科分类号
摘要
Hobie Beach, in Port Elizabeth, South Africa, is situated on a section of Algoa Bay that has a shallow, gently sloping, rocky seabed. In the past this feature resulted in a relatively thin covering of sand on the beach. A pier was built to extend this headland by incorporating into the pier a continuous barrier along the seabed, thereby increasing the depth of the sand on Hobie Beach. Because of its prominence on the beachfront it was essential that the pier should be attractive and pleasing to the public. The pier comprises a 136-m-long deck supported on an abutment and 11 columns. The deck is 6 m to 9 m wide. The structure has been designed to withstand the roughest seas and to be resistant to the aggressive coastal environment. The columns and their spread footings were made of heavy hollow interlocking precast units placed on the seabed and stacked to a suitable height above the water level before being filled with tremie concrete.
引用
收藏
页码:197 / 199
相关论文
共 50 条
  • [41] Applying multi-phase particle swarm optimization to solve bulk cargo port scheduling problem
    Tang, M.
    Gong, D.
    Liu, S.
    Zhang, H.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2016, 11 (04): : 299 - 310
  • [42] Engineering evolutionary algorithm to solve multi-objective OSPF weight setting problem
    Sait, Sadiq M.
    Sqalli, Mohammed H.
    Mohiuddin, Mohammed Aijaz
    AI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4304 : 950 - +
  • [43] Exact method for single vessel and multiple quay cranes to solve scheduling problem at port of Tripoli-Lebanon
    Skaf, A.
    Lamrous, S.
    Hammoudan, Z.
    Manier, M. A.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 457 - 461
  • [45] An efficient lexicographic approach to solve multi-objective multi-port fabric dyeing machine planning problem
    Demir, Yunus
    APPLIED SOFT COMPUTING, 2023, 144
  • [46] Some Internet-based strategies that help solve the problem of teaching large groups of engineering students
    Mompo, Rafael
    Redoli, Judith
    INNOVATIONS IN EDUCATION AND TEACHING INTERNATIONAL, 2010, 47 (01) : 95 - 102
  • [47] Novel modifications of social engineering optimizer to solve a truck scheduling problem in a cross-docking system
    Fathollahi-Fard, Amir Mohammad
    Ranjbar-Bourani, Mehdi
    Cheikhrouhou, Naoufel
    Hajiaghaei-Keshteli, Mostafa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [48] The unsolved chapter of vocal fold scars and how tissue engineering could help us solve the problem
    M. Graupp
    S. Bachna-Rotter
    C. Gerstenberger
    G. Friedrich
    E. Fröhlich-Sorger
    K. Kiesler
    M. Gugatschka
    European Archives of Oto-Rhino-Laryngology, 2016, 273 : 2279 - 2284
  • [49] The unsolved chapter of vocal fold scars and how tissue engineering could help us solve the problem
    Graupp, M.
    Bachna-Rotter, S.
    Gerstenberger, C.
    Friedrich, G.
    Froehlich-Sorger, E.
    Kiesler, K.
    Gugatschka, M.
    EUROPEAN ARCHIVES OF OTO-RHINO-LARYNGOLOGY, 2016, 273 (09) : 2279 - 2284