共 37 条
- [32] CONSTRUCTION OF REINFORCED-CONCRETE MULTISTORY OFFICE BUILDINGS - A SIMULATION-MODEL FOR TIME COST CALCULATIONS - FIRST STAGE COMPUTER-SIMULATION MODEL FOR THE DURATION AND COST ESTIMATION OF THE CONSTRUCTION OF A TYPICAL MULTISTORY CONCRETE FRAMED OFFICE BUILDING PROVIDING RAPID RESPONSE TO CHANGES IN INPUT VALUES AND THEIR EFFECT ON THE DURATION AND COST OF THE PROJECT BUILDING RESEARCH AND INFORMATION, 1995, 23 (04): : 227 - 233
- [34] Construction simulation approach of roller-compacted concrete dam based on real-time monitoring基于实时监控的碾压混凝土坝施工仿真 Journal of Zhejiang University-SCIENCE A, 2018, 19 : 367 - 383
- [36] THE CONSTRUCTION OF A 3RD-ORDER SECULAR ANALYTICAL J-S-U-N THEORY BY HORI-LIE TECHNIQUE .3. DETERMINATION OF (S(1), S(2)) AND (F(1)', F(2)', F(3)') EARTH MOON AND PLANETS, 1994, 64 (01): : 59 - 93
- [37] THE CONSTRUCTION OF A 3RD-ORDER SECULAR ANALYTICAL J-S-U-N THEORY BY THE HORI-LIE TECHNIQUE .2. DETERMINATION OF (F-1S, F-2S, F-3S) AND (F-1C, F-2C) EARTH MOON AND PLANETS, 1993, 63 (01): : 29 - 66