CONSTRUCTION EQUIPMENT: NEW PUSH FOR PRODUCTIVITY.

被引:0
|
作者
Dann, Richard T.
机构
来源
Machine Design | 1981年 / 53卷 / 10期
关键词
PRODUCTIVITY;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:66 / 76
相关论文
共 50 条
  • [1] NEW SURVEYING EQUIPMENT AIDS PRODUCTIVITY.
    Agee, William K.
    Public Works, 1988, 119 (04): : 60 - 61
  • [2] NEW METHODS, EQUIPMENT BOOST METAL STAMPING PRODUCTIVITY.
    Pennington, Neiland
    Modern Metals, 1986, 42 (01): : 46 - 56
  • [3] MANAGEMENT OF CONSTRUCTION PRODUCTIVITY.
    Tucker, Richard L.
    Journal of Management in Engineering, 1986, 2 (03) : 148 - 156
  • [4] FACTOR MODEL OF CONSTRUCTION PRODUCTIVITY.
    Thomas, H.Randolph
    Yiakoumis, Iacovos
    Journal of Construction Engineering and Management, 1987, 113 (04) : 632 - 639
  • [5] SINGAPORE'S COMPUTERISATION UPRATES EQUIPMENT PRODUCTIVITY.
    HICKS, PATRICK
    1600, (V 9):
  • [6] LEARNING CURVE MODELS OF CONSTRUCTION PRODUCTIVITY.
    Thomas, H.Randolph
    Mathews, Cody T.
    Ward, James G.
    1600, (112):
  • [7] EQUIPMENT ADVANCES BOOST METAL STAMPING PRODUCTIVITY.
    Pennington, Neiland
    Modern Metals, 1982, 38 (10): : 34 - 38
  • [8] COMPOUNDING EQUIPMENT BECOMES TOOL FOR INCREASING PRODUCTIVITY.
    Smoluk, George
    Modern Plastics, 1987, 64 (07): : 64 - 67
  • [9] INCREASING PRODUCTIVITY.
    Lenkus, Dave
    Wood & wood products, 1984, 89 (07): : 45 - 56
  • [10] Mergers and productivity.
    Kwoka, JE
    JOURNAL OF ECONOMIC LITERATURE, 2002, 40 (02) : 540 - 541