共 50 条
- [42] Construction and Operation of Eschenfelden Underground Storage Installation. 1978, 58 (11): : 793 - 798
- [43] LOW COST ENVIRONMENTAL NOISE MONITORING INSTALLATION. Noise Control Vibration Isolation, 1979, 10 (07): : 275 - 277
- [44] SEMIAUTOMATIC HYDRAULIC SHOT-BLAST INSTALLATION. Soviet Energy Technology (English translation of Energomashinostroenie), 1985, (10): : 55 - 59
- [45] Car with hybrid power installation. Experimental results Avtomobil'naya Promyshlennost, 2001, (11): : 9 - 10
- [50] Mathematical Model of PLEM Installation in Deepwater PROCEEDINGS OF THE ASME 34TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2015, VOL 7, 2015,