共 50 条
- [25] Optimal Production-Inventory Policy under Energy Buy-Back Program OPERATIONS RESEARCH AND ITS APPLICATIONS, 2010, 12 : 526 - 532
- [28] INVENTORY PROBLEMS UNDER MULTIPLE CONSTRAINTS - SOME STUDIES ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1985, 9 (04): : 355 - 367
- [30] Scheduling with multiple voltages under resource constraints ISCAS '99: PROCEEDINGS OF THE 1999 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL 1: VLSI, 1999, : 350 - 353