System Modeling for V&V

被引:0
|
作者
Clark, B.E. [1 ]
Frank, G.A. [1 ]
机构
[1] Center for Digital Systems Research, Research Triangle Institute, Research Triangle Park, NC,27709, United States
关键词
D O I
10.1002/j.2334-5837.1992.tb01531.x
中图分类号
学科分类号
摘要
Simulation and formal models are becoming an accepted part of the early stages of system design. This paper discusses the use of executable system models during system design and implementation. RTI recently developed an abstract executable model of the operating system developed for an avionics test bed based on the PAVE PILLAR architecture. The target hardware consisted of two processing clusters, each with five VHSIC 1750A modules connected by a parallel bus and a system mass memory. The three components are connected by two optical high-speed data busses. The modeling was done while both the hardware and software were under development. The process of developing and validating the models produced a significant V&V payoff for the design teams. Formal modeling forced early consideration of hardware/software, inter-module, and inter-application interfaces that were overlooked during the system design process. This led to forecasting system problems that normally would not have been discovered until system integration. This paper will review the modeling effort and show, in a systems engineering context, how abstract modeling can serve as a powerful method for early discovery of interface errors normally not found until integration. © 1992 The Authors.
引用
收藏
页码:485 / 491
相关论文
共 50 条
  • [31] An integrated V&V environment for critical systems development
    Traoré, I
    FIFTH IEEE INTERNATIONAL SYMPOSIUM ON REQUIREMENTS ENGINEERING, PROCEEDINGS, 2001, : 287 - 287
  • [32] Integrated system bench for design V&V using real-time simulation
    Wang, William
    Van Hoang, Tran
    Jaw, Link
    Chou, Wendy
    Crum, Vincent
    Homan, David
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 3854 - 3860
  • [33] V&V application in generic simulation models in logistics
    Sarnow, T.
    Elbert, R.
    JOURNAL OF SIMULATION, 2024, 18 (02) : 180 - 190
  • [34] 6.4.1 How Cost Effective is your V&V?
    1600, John Wiley and Sons Inc (23):
  • [35] V&V for turbulent mixing in the intermediate asymptotic regime
    Zhang, H.
    Kaman, T.
    She, D.
    Cheng, B.
    Glimm, J.
    Sharp, D. H.
    PURE AND APPLIED MATHEMATICS QUARTERLY, 2018, 14 (01) : 193 - 222
  • [36] MOVING FROM V&V TO V&V&C IN NUCLEAR THERMAL-HYDRAULICS
    D'Auria, Francesco
    Lanfredini, Marco
    PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2018, VOL 4, 2018,
  • [37] Supporting Qualified Database for V&V and Uncertainty Evaluation of Best-Estimate System Codes
    Petruzzi, A.
    D'Auria, F.
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 2B, 2014,
  • [38] Modeling the "good enough to release" decision using V&V preference structures and Bayesian belief networks
    Donohue, SK
    Dugan, JB
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2003 PROCEEDINGS, 2003, : 568 - 573
  • [39] Verification and Validation (V&V) for Safe Deployment of Automated Driving Systems - In Depth Evaluation of State-of-the-Art V&V Methods in the Automotive Sector
    Siegl, Sebastian
    Dueser, Tobias
    2024 IEEE INTERNATIONAL WORKSHOP ON METROLOGY FOR AUTOMOTIVE, METROAUTOMOTIVE 2024, 2024, : 64 - 69
  • [40] Emerging technologies for V&V of ISHM software for space exploration
    Feather, Martin S.
    Markosian, Lawrence Z.
    2006 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2006, : 4204 - +