共 50 条
- [42] Organization of geodetic works during the reconstruction of hydroelectric power stations 6Th International Conference Environmental Engineering, Vols 1 and 2, 2005, : 826 - 830
- [43] OPTIMIZATION OF WORK REGIME OF HYDROELECTRIC STATIONS IN POWER-SYSTEMS ELECTRICAL TECHNOLOGY, 1975, (01): : 124 - 129
- [45] PROCESS-CONTROL SYSTEMS IN HYDROELECTRIC POWER-STATIONS BROWN BOVERI REVIEW, 1977, 64 (05): : 297 - 304
- [46] Evaluation of Failure and Repair of the Jebba and the Shiroro Hydroelectric Power Stations Journal of Failure Analysis and Prevention, 2019, 19 : 488 - 495
- [47] BERSIA AND KENERING - HYDROELECTRIC POWER STATIONS FOR MALAYSIA'S POWER SUPPLY. Siemens Power Engineering & Automation, 1985, 7 (05): : 349 - 352
- [48] The operational development of generators at small hydroelectric power stations in the Dagenergo power system Elektrichestvo, 2002, (06): : 41 - 43
- [49] Electromechanical Equipment for Integrated Use of Power Potential of Hydroelectric Power Plant Reservoirs 2020 IEEE 7TH INTERNATIONAL CONFERENCE ON ENERGY SMART SYSTEMS (2020 IEEE ESS), 2020, : 93 - 96
- [50] Ecological problems in the area of the man-made ponds of the Angara Cascade Hydroelectric Stations ENGINEERING GEOLOGY AND THE ENVIRONMENT, VOLS 1-3, 1997, : 2825 - 2830