Simulation of temperature and stress fields during RCC dam construction

被引:3
|
作者
Luna, Ronaldo [1 ]
Wu, Yong [2 ]
机构
[1] Dept. of Civ. Engrg., Univ. of Missouri at Rolla, 1870 Miner Circle, Rolla, MO 65409, United States
[2] Dept. of Civ. Engrg., Univ. of Missouri at Rolla, 1870 Miner Circle, Rolla, MO, United States
关键词
Computer simulation - Concrete construction - Creep - Elastic moduli - Finite element method - Hydration - Rollers (roadbuilding machinery) - Stress analysis - Thermal variables control;
D O I
暂无
中图分类号
学科分类号
摘要
The worldwide experience in the construction of roller-compacted concrete (RCC) dams together with the use of numerical solutions, allows the simulation of different scenarios in a computer. It is well documented that thermal control is one of the most important problems for RCC dam construction. The dam temperature changes due to the heat produced by the internal hydration of concrete and the environmental boundary conditions influencing the elastic modulus and creep properties of concrete. The construction process was simulated to study how the temperature and stress change during dam construction. The numerical methodology considers the effect of temperature on the elastic modulus and the creep behavior of concrete. A 3D finite-element program was developed to simulate the construction process. An engineering application of this methodology is presented by simulating the construction of an RCC gravity dam in southern China. The results show how the temperature and stress change with the construction process. The results also show that it is feasible to build RCC dams in low temperature seasons without additional temperature control measures.
引用
收藏
页码:381 / 388
相关论文
共 50 条
  • [31] A new method for construction of drainage holes of RCC dam
    Xie, Xiang-Ming
    Guo, Lei
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION ICMS2010, VOL 3: MODELLING AND SIMULATION IN INDUSTRIAL APPLICATION, 2010, : 191 - 194
  • [32] The Upper Paunglaung RCC dam-design and construction
    Zaw, U. Myint
    Han, U. Thaung
    Rohrer, Ch.
    Steiger, K. M.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 559 - 567
  • [33] Construction supervision for safety monitoring facilities of RCC dam
    Yang, Zhisheng
    Renmin Changjiang/Yangtze River, 1999, 30 (06): : 46 - 47
  • [34] Review of some points in the RCC practice for dam construction
    Andriolo, FR
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 897 - 903
  • [35] Computer simulation of temperature and thermal stress fields during quenching process
    Chen, XL
    Meekisho, L
    QUENCHING AND THE CONTROL OF DISTORTION, 1996, : 241 - 247
  • [36] Numerical Simulation on Temperature and Stress Fields in Beryllium During Cutting Process
    董平
    张鹏程
    李瑞文
    Journal of Shanghai Jiaotong University(Science), 2011, 16 (03) : 329 - 332
  • [37] Numerical simulation on temperature and stress fields in beryllium during cutting process
    Dong P.
    Zhang P.-C.
    Li R.-W.
    Journal of Shanghai Jiaotong University (Science), 2011, 16 (3) : 329 - 332
  • [38] Controlling RCC mix workability for Olivenhain dam construction
    Bennett, BC
    Rugh, MP
    Stiady, JL
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 923 - 932
  • [39] Construction of Iran's first large RCC dam
    Jyane Construction Co. Ltd., No. 2, 37th Alley, Africa Boulevard, Africa Square, Tehran 15169, Iran
    不详
    Int J Hydropower Dams, 2008, 3 (83-88):
  • [40] MATERIAL HANDLING - THE KEY IN RCC DAM CONSTRUCTION.
    Anon
    Highway & heavy construction, 1986, 129 (12): : 46 - 47