共 50 条
- [42] Model Test for a New Chorded Arch Bridge ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1061 - 1064
- [44] Influencing parameters of stability for reinforced concrete tied-arch bridge Chang'an Daxue Xuebao, 2008, 4 (43-46):
- [48] Construction of Steel Tube Concrete Arch Bridge after Axes Change ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 831 - 835
- [49] High-temperature Closure Control Technology of Concrete Arch Bridge Using Cable-Stayed Buckle and Cantilever Construction Method Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1032 - 1037
- [50] Construction practice of the concrete-filled steel tube arch bridge STRUCTURES IN THE NEW MILLENNIUM, 1997, : 499 - 502