共 50 条
- [21] Thiess Contractors of Queensland has applied total quality management to Brisbane's Gateway Motorway Extension Project Civil Engineers Australia, 1997, 69 (06):
- [22] The Construction and Analysis of the Green Value Chain of Port Construction Project 2014 2ND INTERNATIONAL CONFERENCE ON ECONOMIC, BUSINESS MANAGEMENT AND EDUCATION INNOVATION (EBMEI 2014), VOL 33, 2014, 33 : 163 - 166
- [24] Application of Ecological Restoration Project in Port Construction 3RD INTERNATIONAL CONFERENCE ON GREEN MATERIALS AND ENVIRONMENTAL ENGINEERING (GMEE), 2017, : 32 - 34
- [26] Environmental Risk Identification of Port Construction Project 2011 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND INFORMATION APPLICATION TECHNOLOGY ESIAT 2011, VOL 10, PT C, 2011, 10 : 2783 - 2787
- [27] Geotechnical Risk Management during Design and Construction FORENSIC ENGINEERING 2022: ELEVATING FORENSIC ENGINEERING, 2022, : 511 - 516
- [28] Geotechnical aspects on design and construction of stabilization ponds Water Resources Management III, 2005, 80 : 31 - 39
- [29] Geotechnical design and construction of breakwaters, Bilbao Harbour GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 489 - 508
- [30] Geotechnical design & construction from 1848 to 1998 Civil Engineering Practice, 13 (02): : 7 - 30