Adaptive stochastic approach for solving long-term hydrothermal scheduling problems

被引:0
|
作者
Chaves, Caio Nogueira [1 ]
da Silva, Tiago Forti [1 ]
Gaspar, Joao Paulo Manarelli [1 ]
Martins, Andre Christovao Pio [1 ]
Soler, Edilaine Martins [2 ]
Balbo, Antonio Roberto [2 ]
Nepomuceno, Leonardo [1 ]
机构
[1] Unesp Univ Estadual Paulista, Fac Engn FEB, Dept Elect Engn, BR-17033360 Bauru, SP, Brazil
[2] Unesp Univ Estadual Paulista, Fac Sci FC, Dept Math, BR-17033360 Bauru, SP, Brazil
关键词
Long-term hydrothermal scheduling; Adaptive stochastic approach; Rolling horizon approach; Multi-stage stochastic optimization; OPTIMIZATION; UNCERTAINTY; STRATEGIES;
D O I
10.1016/j.apenergy.2024.124730
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The long-term hydrothermal scheduling (HTS) is a multi-stage stochastic optimization problem which aims to calculate a decision policy regarding the operation of hydrothermal systems that minimizes the expected costs while taking into account physical and operational constraints of the system. The HTS problem has traditionally been solved by means of stochastic dual dynamic programming (SDDP). Despite its successful utilization for solving large-scale HTS problems, the computation times for solving the HTS problem by means of an SDDP approach may become prohibitive in the context of energy markets (where the HTS model generally appears in the lower level of bilevel equilibrium problems) and also in the context of risk-averse decision making policies. In these contexts, rolling horizon (RH) approaches can provide a good trade-off between optimality and computational effort. The RH approach approximates expected future costs by means of a single forward procedure. Although the RH approach is able to fully explore uncertainties embedded in the set of scenarios, it does not present a mechanism for evaluating the errors in the expected future costs, which may result in some level of cost sub-optimality. In this paper, an adaptive stochastic (AS) approach is proposed for solving multi-stage stochastic optimization problems that enhances the level of optimality of the RH approach. Two HTS models are proposed, involving the adoption of the RH and the AS approaches, respectively. The decision- making policies calculated by these models are compared in terms of the evolution of the expected values for power dispatches, optimality, prices, and reservoir volumes. Numerical results confirm the higher levels of optimality achieved by the proposed AS approach where reduction costs of near 20% were achieved fora portion of the Brazilian system with a total of 48.4 GW, which represents 47.4% of the installed hydraulic capacity of this system, as well as significant improvements in the hydraulic and economic aspects (e.g. prices were reduced around 50% in peak periods fora 10-power plant study) of the HTS problem. A post-optimization simulation procedure conducted to evaluate the quality of the uncertainty modeling within the proposed RHHTS and AS-HTS models demonstrates that the decisions calculated by both models have proven to be highly robust in withstanding random water inflows.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Stochastic Induction of Long-Term Potentiation and Long-Term Depression
    Antunes, G.
    Roque, A. C.
    Simoes-de-Souza, F. M.
    SCIENTIFIC REPORTS, 2016, 6
  • [42] A hybrid method for solving stochastic job shop scheduling problems
    Tavakkoli-Moghaddam, R
    Jolai, F
    Vaziri, F
    Ahmed, PK
    Azaron, A
    APPLIED MATHEMATICS AND COMPUTATION, 2005, 170 (01) : 185 - 206
  • [43] Introducing Adaptive Machine Learning Technique for Solving Short-Term Hydrothermal Scheduling with Prohibited Discharge Zones
    Akram, Saqib
    Fakhar, Muhammad Salman
    Kashif, Syed Abdul Rahman
    Abbas, Ghulam
    Ullah, Nasim
    Mohammad, Alsharef
    Farrag, Mohamed Emad
    SUSTAINABILITY, 2022, 14 (18)
  • [44] Non-uniform composite representation of hydroelectric systems for long-term hydrothermal scheduling
    UNICAMP, Campinas, Brazil
    IEEE Trans Power Syst, 2 (702-707):
  • [45] Non-uniform composite representation of hydroelectric systems for long-term hydrothermal scheduling
    daCruz, G
    Soares, S
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) : 702 - 707
  • [46] Model Predictive Control Applied to the Long-Term Hydrothermal Scheduling of the Brazilian Power System
    Zambelli, Monica S.
    Martins, Leonardo S. A.
    Soares, Secundino
    2013 IEEE GRENOBLE POWERTECH (POWERTECH), 2013,
  • [47] Long-term approach to long-term conditions
    Davis, Peter
    INTERNATIONAL JOURNAL OF ORTHOPAEDIC AND TRAUMA NURSING, 2005, 9 (02) : 59 - 60
  • [48] Long-term extreme response evaluation of stochastic models using adaptive stochastic importance sampling
    Zhang, Tongzhou
    Hu, Weifei
    Zhao, Feng
    Yan, Jiquan
    Tang, Ning
    Lee, Ikjin
    Tan, Jianrong
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2025, 260
  • [49] Long-Term Hydrothermal Proppant Performance
    Raysoni, Neelam
    Weaver, Jim
    SPE PRODUCTION & OPERATIONS, 2013, 28 (04): : 414 - 426
  • [50] NLMK: From solving the current problems to constructing the strategy of long-term development
    Lisin, V.S.
    Stal', 2001, (06): : 11 - 15