Adaptive stochastic approach for solving long-term hydrothermal scheduling problems

被引:0
|
作者
Chaves, Caio Nogueira [1 ]
da Silva, Tiago Forti [1 ]
Gaspar, Joao Paulo Manarelli [1 ]
Martins, Andre Christovao Pio [1 ]
Soler, Edilaine Martins [2 ]
Balbo, Antonio Roberto [2 ]
Nepomuceno, Leonardo [1 ]
机构
[1] Unesp Univ Estadual Paulista, Fac Engn FEB, Dept Elect Engn, BR-17033360 Bauru, SP, Brazil
[2] Unesp Univ Estadual Paulista, Fac Sci FC, Dept Math, BR-17033360 Bauru, SP, Brazil
关键词
Long-term hydrothermal scheduling; Adaptive stochastic approach; Rolling horizon approach; Multi-stage stochastic optimization; OPTIMIZATION; UNCERTAINTY; STRATEGIES;
D O I
10.1016/j.apenergy.2024.124730
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The long-term hydrothermal scheduling (HTS) is a multi-stage stochastic optimization problem which aims to calculate a decision policy regarding the operation of hydrothermal systems that minimizes the expected costs while taking into account physical and operational constraints of the system. The HTS problem has traditionally been solved by means of stochastic dual dynamic programming (SDDP). Despite its successful utilization for solving large-scale HTS problems, the computation times for solving the HTS problem by means of an SDDP approach may become prohibitive in the context of energy markets (where the HTS model generally appears in the lower level of bilevel equilibrium problems) and also in the context of risk-averse decision making policies. In these contexts, rolling horizon (RH) approaches can provide a good trade-off between optimality and computational effort. The RH approach approximates expected future costs by means of a single forward procedure. Although the RH approach is able to fully explore uncertainties embedded in the set of scenarios, it does not present a mechanism for evaluating the errors in the expected future costs, which may result in some level of cost sub-optimality. In this paper, an adaptive stochastic (AS) approach is proposed for solving multi-stage stochastic optimization problems that enhances the level of optimality of the RH approach. Two HTS models are proposed, involving the adoption of the RH and the AS approaches, respectively. The decision- making policies calculated by these models are compared in terms of the evolution of the expected values for power dispatches, optimality, prices, and reservoir volumes. Numerical results confirm the higher levels of optimality achieved by the proposed AS approach where reduction costs of near 20% were achieved fora portion of the Brazilian system with a total of 48.4 GW, which represents 47.4% of the installed hydraulic capacity of this system, as well as significant improvements in the hydraulic and economic aspects (e.g. prices were reduced around 50% in peak periods fora 10-power plant study) of the HTS problem. A post-optimization simulation procedure conducted to evaluate the quality of the uncertainty modeling within the proposed RHHTS and AS-HTS models demonstrates that the decisions calculated by both models have proven to be highly robust in withstanding random water inflows.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] An Introductory Tutorial on Stochastic Programming Using a Long-term Hydrothermal Scheduling Problem
    Finardi, Erlon Cristian
    Decker, Brigida Uarthe
    de Matos, Vitor Luiz
    JOURNAL OF CONTROL AUTOMATION AND ELECTRICAL SYSTEMS, 2013, 24 (03) : 361 - 376
  • [2] Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
    Vitor L. de Matos
    David P. Morton
    Erlon C. Finardi
    Annals of Operations Research, 2017, 253 : 713 - 731
  • [3] Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
    de Matos, Vitor L.
    Morton, David P.
    Finardi, Erlon C.
    ANNALS OF OPERATIONS RESEARCH, 2017, 253 (02) : 713 - 731
  • [4] Stochastic Long-Term Hydrothermal Scheduling With Parameter Uncertainty in Autoregressive Streamflow Models
    Bezerra, Bernardo
    Veiga, Alvaro
    Barroso, Luiz Augusto
    Pereira, Mario
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (02) : 999 - 1006
  • [5] Scenario techniques for long-term hydrothermal scheduling
    Martinez, L
    Soares, S
    HYDROPOWER IN THE NEW MILLENNIUM, 2001, : 85 - 91
  • [6] Assessment of Parameter Uncertainty in Autoregressive Streamflow Models for Stochastic Long-term Hydrothermal Scheduling
    Bezerra, Bernardo
    Veiga, Alvaro
    Barroso, Luiz Augusto
    Pereira, Mario
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [7] A Stochastic MILP Model for Long-term Hydrothermal Scheduling Considering Water Resource Management
    Tong Bo
    Zhai Qiaozhu
    Guan Xiaohong
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2603 - 2608
  • [8] Deterministic versus stochastic models for long term hydrothermal scheduling
    Zambelli, M.
    Siqueira, T. G.
    Cicogna, A.
    Soares, S.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3985 - +
  • [9] A Predictive Control Approach for Long Term Hydrothermal Scheduling
    Zambelli, Monica S.
    Soares, Secundino
    2009 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION, VOLS 1-3, 2009, : 581 - 588
  • [10] STOCHASTIC LONG-TERM HYDROTHERMAL OPTIMIZATION FOR A MULTIRESERVOIR SYSTEM
    SHERKAT, VR
    CAMPO, R
    MOSLEHI, K
    LO, EO
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1985, 104 (08): : 2040 - 2050