Quotation planning in dynamic production networks

被引:0
|
作者
Broda E. [1 ]
Sayah D. [2 ]
Freitag M. [3 ]
机构
[1] Universität Bremen, Fachbereich Produktionstechnik, Badgasteiner Str. 1, Bremen
[2] FZI Forschungszentrum Informatik, Haid-und-Neu-Str. 10–14, Karlsruhe
[3] BIBA – Bremer Institut für Produktion und Logistik GmbH, Hochschulring 20, Bremen
来源
WT Werkstattstechnik | 2021年 / 111卷 / 03期
关键词
Compendex;
D O I
10.37544/1436-4980-2021-03-55
中图分类号
学科分类号
摘要
The BMBF-research project “Dynamic Production Network Broker (DPNB)” is dedicated to the application scenario “orderdriven manufacturing” in the context of Industry 4.0. A central question for quotation planning is how to connect manufacturing capabilities and capacities across companies to build an order-specific supply chain network. This paper addresses the core issues of processing a manufacturing request. © 2021, VDI Fachmedien GmBbH & Co.. All rights reserved.
引用
收藏
页码:147 / 151
页数:4
相关论文
共 50 条
  • [31] Modelling Dynamic Bottlenecks in Production Networks
    Scholz-Reiter, Bernd
    Windt, Katja
    Liu, Huaxin
    PROCEEDINGS OF THE 6TH CIRP-SPONSORED INTERNATIONAL CONFERENCE ON DIGITAL ENTERPRISE TECHNOLOGY, 2010, 66 : 1445 - +
  • [32] Decentralized dynamic task planning for heterogeneous robotic networks
    Donato Di Paola
    Andrea Gasparri
    David Naso
    Frank L. Lewis
    Autonomous Robots, 2015, 38 : 31 - 48
  • [33] Adaptive and dynamic process planning using neural networks
    Joo, J
    Park, S
    Cho, HB
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (13) : 2923 - 2946
  • [34] Decentralized dynamic task planning for heterogeneous robotic networks
    Di Paola, Donato
    Gasparri, Andrea
    Naso, David
    Lewis, Frank L.
    AUTONOMOUS ROBOTS, 2015, 38 (01) : 31 - 48
  • [35] Flexibility in the Formation and Operational Planning of Dynamic Manufacturing Networks
    Sadic, Senay
    de Sousa, Jorge Pinho
    Crispim, Jose Antonio
    RISKS AND RESILIENCE OF COLLABORATIVE NETWORKS, 2015, 463 : 604 - 611
  • [36] APPLICATION OF DYNAMIC PROGRAMMING FOR PLANNING OF MAIN CABLE NETWORKS
    RAPP, Y
    ERICSSON REVIEW, 1973, 50 (03): : 90 - 100
  • [37] Modeling and analyzing dynamic cycle networks for manufacturing planning
    Plehn, C.
    Koch, J.
    Diepold, K.
    Stahl, B.
    Lohman, B.
    Reinhart, G.
    Zaeh, M. F.
    3RD CIRP GLOBAL WEB CONFERENCE - PRODUCTION ENGINEERING RESEARCH ADVANCEMENT BEYOND STATE OF THE ART (CIRPE2014), 2015, 28 : 149 - 154
  • [38] Balanced Dynamic Planning in Green Heterogeneous Cellular Networks
    Kashef, Mohamed
    Ismail, Muhammad
    Serpedin, Erchin
    Qaraqe, Khalid
    IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, 2016, 34 (12) : 3299 - 3312
  • [39] Partner selection and synchronized planning in dynamic manufacturing networks
    Viswanadham, N
    Gaonkar, RS
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2003, 19 (01): : 117 - 130
  • [40] Dynamic collaborative quotation negotiation and decision making process
    Agarwal, Vineet
    Ramani, Karthik
    TOOLS AND METHODS OF COMPETITIVE ENGINEERING Vols 1 and 2, 2004, : 965 - 976