Dewatering of the Dongjiadu tunnel restoration on Shanghai metro line 4

被引:0
|
作者
Qu, Cheng-Song [1 ,2 ,3 ]
机构
[1] College of Water Sciences, Beijing Normal University, Beijing 100875, China
[2] Engineering Research Center for Groundwater Pollution Control and Remediation, Ministry of Education of China, Beijing 100875, China
[3] Shanghai Changkai Geotechnical Co., Ltd., Shanghai 200002, China
来源
Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering | 2010年 / 32卷 / SUPPL. 2期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:339 / 342
相关论文
共 50 条
  • [1] Application of artificial freezing to recovering a collapsed tunnel in Shanghai metro No.4 line
    Fang, Jianghua
    Zhang, Zhihong
    Zhang, Jingyu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2009, 42 (08): : 124 - 128
  • [2] Analysis of the effects of environments for dewatering in a metro station in shanghai
    Tang, Yi-Qun
    Luan, Chang-Qing
    Wang, Jian-Xiu
    Zhu, Yan-Fei
    Pan, Wei-Qiang
    Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology, 2008, 30 (08): : 147 - 151
  • [3] Long-term tunnel settlement mechanisms of Metro Line 2 in Shanghai
    Ng, C. W. W.
    Li, Q.
    Liu, G. B.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 21 - 36
  • [4] Investigation of the long-term tunnel settlement mechanisms of the first metro line in Shanghai
    Ng, C. W. W.
    Liu, G. B.
    Li, Q.
    CANADIAN GEOTECHNICAL JOURNAL, 2013, 50 (06) : 674 - 684
  • [5] Optimizing dewatering design for a metro station on the Chengdu Metro Line 7
    Li Ke
    Kang Xiao-bing
    JOURNAL OF GROUNDWATER SCIENCE AND ENGINEERING, 2019, 7 (02): : 155 - 164
  • [6] Civil engineering of the first line of Shanghai metro
    Wang, Zhenxin
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 1988, 21 (03): : 1 - 14
  • [7] THE 1ST METRO LINE IN SHANGHAI
    WANG, ZX
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1989, 4 (04) : 461 - 464
  • [8] Catastrophic Failure of Shanghai Metro Line 4 in July 2003: Postaccident Rehabilitation
    Tan, Yong
    Lu, Ye
    Wang, Dalong
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2023, 37 (02)
  • [9] Twin tunnel configuration for Greater Cairo metro line No. 4
    Rahim, Hamdy H. A. Abd-el.
    Enieb, Mahmoud
    Khalil, Ahmed Abdelmoamen
    Ahmed, Abdou S. H.
    COMPUTERS AND GEOTECHNICS, 2015, 68 : 66 - 77
  • [10] Design and implementation of surface dewatering in the Yongnan running tunnel of the Xi'an metro
    Yan, R. (yanrs@163.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):