Long-term tunnel settlement mechanisms of Metro Line 2 in Shanghai

被引:0
|
作者
Ng, C. W. W. [1 ]
Li, Q. [1 ]
Liu, G. B.
机构
[1] Hong Kong Univ Sci & Technol, Hong Kong, Hong Kong, Peoples R China
关键词
LAND SUBSIDENCE;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Non-uniform excessive tunnel settlements and relatively small tunnel heaves have been observed along Shanghai Metro Lines 1 and 2 over the last 15 years. Tunnels of the Metro lines were constructed using an Earth Pressure Balance (EPB) machine. It is well-known that significant long-term tunnel settlements may pose a threat to the serviceability and safety of the underground metro systems. However, the mechanisms of the observed large long-term tunnel settlements up to 144 mm at some stations are still not fully understood. In this paper, measured tunnel settlements of the 16.4 km long Metro Line 2 from 1999 to 2007 are studied together with groundwater pumping records from 1920s. Four possible causes including the effects of tunnel construction, secondary compression of soft clay, cyclic loading due to running trains, and groundwater pumping for the observed large tunnel settlements at some stations are investigated based on desk study, results of static and cyclic laboratory tests and coupled consolidation finite element analyses. The likely mechanism for the observed long-term tunnel settlement is identified and discussed.
引用
收藏
页码:21 / 36
页数:16
相关论文
共 50 条
  • [1] Investigation of the long-term tunnel settlement mechanisms of the first metro line in Shanghai
    Ng, C. W. W.
    Liu, G. B.
    Li, Q.
    CANADIAN GEOTECHNICAL JOURNAL, 2013, 50 (06) : 674 - 684
  • [2] Study on dynamic response and long-term settlement of silty soil around Shanghai metro tunnel
    Sang, Biaowei
    Yan, Chunling
    Wang, Cheng
    Qu, Xin
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [4] Long-term settlement prediction over Shanghai metro tunnels
    Huang, H. W.
    Zhang, D. M.
    Hicher, P. Y.
    PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOLS 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 1045 - 1048
  • [5] Long-term settlement behaviour of metro tunnels in the soft deposits of Shanghai
    Shen, Shui-Long
    Wu, Huai-Na
    Cui, Yu-Jun
    Yin, Zhen-Yu
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 309 - 323
  • [6] Long-Term Settlement of Subway Tunnel and Prediction of Settlement Trough in Coastal City Shanghai
    Cui, Zhen-Dong
    Hua, Shan-Shan
    Yan, Jia-Sen
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: MULTI-PHYSICS PROCESSES IN SOIL MECHANICS AND ADVANCES IN GEOTECHNICAL TESTING, 2018, : 458 - 467
  • [7] Analysis and Prediction of Long-Term Settlement of Metro Shield Tunnel in Saturated Sand
    Liu, Jianzheng
    Yang, Yixin
    Yang, Chunjie
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (07) : 5241 - 5252
  • [8] Forecast of long-term settlement of metro tunnel on the basis of ant colony optimization
    Key Laboratory of Road, Tongji University, Shanghai 200092, China
    Tiedao Xuebao, 2008, 4 (79-83):
  • [9] Analysis and Prediction of Long-Term Settlement of Metro Shield Tunnel in Saturated Sand
    Jianzheng Liu
    Yixin Yang
    Chunjie Yang
    Geotechnical and Geological Engineering, 2021, 39 : 5241 - 5252
  • [10] Long-term settlement of metro viaduct piers: A case study in Shanghai soft soil
    Xiao, Junhua
    Shan, Jie
    Wu, Nan
    Liu, Mengbo
    Wan, Hongyu
    Sun, Siqi
    Long, Xuyou
    TRANSPORTATION GEOTECHNICS, 2023, 42