共 50 条
- [22] Upgrade of the TOTEM DAQ using the Scalable Readout System (SRS) JOURNAL OF INSTRUMENTATION, 2013, 8
- [24] CDF run IIb silicon vertex detector DAQ upgrade 2003 IEEE NUCLEAR SCIENCE SYMPOSIUM, CONFERENCE RECORD, VOLS 1-5, 2004, : 1143 - 1147
- [25] DESIGN OF A MULTI-PURPOSE LEBT FOR THE LANSCE FRONT END UPGRADE Proceedings - Linear Accelerator Conference, LINAC, 2024, : 235 - 237
- [26] Lansce 1L harp data acquisition system upgrade International Beam Instrumentation Conference, IBIC 2014, 2014,
- [27] System electronics and DAQ for the silicon vertex detector upgrade for PHENIX 2007 15TH IEEE-NPSS REAL-TIME CONFERENCE, VOLS 1 AND 2, 2007, : 604 - 609
- [28] The 40 MHz trigger-less DAQ for the LHCb Upgrade NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2016, 824 : 280 - 283
- [30] PLATED WIRE SCANNER REVIEW OF THE ELECTRICAL COMMUNICATIONS LABORATORIES, 1971, 19 (1-2): : 73 - &