Design of swing device for crown-block heave compensation system

被引:0
|
作者
Zhang, Yan-Ting [1 ,2 ]
Qu, Ying-Feng [1 ]
Liu, Zhen-Dong [1 ]
Ma, Jiang-Tao [1 ]
机构
[1] College of Mechanical and Electrical Engineering, China University of Petroleum, Qingdao 266555, China
[2] State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China
关键词
D O I
10.3785/j.issn.1008-973X.2012.12.019
中图分类号
学科分类号
摘要
A swing device mathematical model was established by the Simulink software system in order to determine the structure parameters of crown-block heave compensation device's key components. The crown-block, compensating cylinder and rocker arm device were simulated dynamically. The interrelation between the inclined angle of wire line, the force on the crown-block affected by wire line and the crown-block displacement was analyzed. The relationship between the angle of two rocker arm and the force state of compensating cylinder was also investigated. The study shows that the structure parameters, such as the length of the rocker arm device, the fixed hinge point position of the rocker arm device and so on, have large effects on the crown-block's motion rule, force state and compensating property. The force of compensating cylinder first decreases and then increases along with the angle of two rocker arm increases when the crown-block moves from the lowest position to highest position. The length of the rocker arm device was calculated, and the fixed hinge point position of the rocker arm device and the fixed hinge point position of the compensating cylinder were determined.
引用
收藏
页码:2268 / 2273
相关论文
共 50 条
  • [31] ENHANCED ACTIVE HEAVE COMPENSATION CONTROL DESIGN FOR NEW RISER HYBRID TENSIONING SYSTEM IN DEEPWATER DRILLING
    Wu, Yin
    PROCEEDINGS OF THE ASME 34TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2015, VOL 1, 2015,
  • [32] Design and simulation study on a virtual prototype of an active heave compensation system for deep-ocean mining
    Tang, XY
    Liu, SJ
    Huang, K
    PROCEEDINGS OF THE SIXTH (2005) ISOPE OCEAN MINING SYMPOSIUM, 2005, : 71 - 75
  • [33] Active heave-compensation system minimises installation downtime
    不详
    NAVAL ARCHITECT, 2003, : 51 - 51
  • [34] On heave compensation system for deep-sea mining equipment
    Xiao, Tibing
    Zhou, Yuming
    Wu, Baihai
    Dai, Jianhong
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON FLUID POWER TRANSMISSION AND CONTROL, 2009, : 127 - 130
  • [35] Semi-active drilling drawworks heave compensation system
    Huang, Lumeng
    Zhang, Yanting
    Zhang, Lei
    Liu, Meiying
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2013, 40 (05): : 620 - 624
  • [36] Application of a New Heave Compensation System for Deepwater Hardware Installation
    Li, Zhenlin
    Sun, Hongfeng
    Duan, Menglan
    AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 97 - 102
  • [37] STUDY ON INTELLIGENT HEAVE COMPENSATION SYSTEM OF MINING EQUIPMENT IN A SHIP
    Ding, Xiaotian
    Liu, Qiang
    JOURNAL OF THE BALKAN TRIBOLOGICAL ASSOCIATION, 2016, 22 (2A): : 1799 - 1807
  • [38] Research on Heave Compensation System Based on Switched Reluctance Motor
    Chen, Juan
    Jiang, Lai
    Zhang, Xiaoping
    SYMMETRY-BASEL, 2024, 16 (10):
  • [39] Active heave compensation control system and motion prediction research
    Zhou, Li
    Duan, Yuxiang
    Ren, Zhengru
    An, Song
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2021, 49 (03): : 98 - 104
  • [40] Research on an Active Heave Compensation System for Remotely Operated Vehicle
    Yang Wenlin
    Zhang Zhuying
    Zhang Aiqun
    INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL 2, PROCEEDINGS, 2008, : 407 - 410