共 50 条
- [42] Live Working on Electrode line of ±800kV DC Transmission Project 2017 1ST INTERNATIONAL CONFERENCE ON ELECTRICAL MATERIALS AND POWER EQUIPMENT (ICEMPE), 2017, : 691 - 694
- [43] Experimental Investigation on Live Working Requirements for 1000kV Ultra High Voltage AC Transmission Line 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
- [44] Research in Live Working for the Straight-Line Tower on UHV DC Transmission Lines 2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2016,
- [45] Time-frequency Characteristic of Potential Transfer Current During Live Working on the 1 000 kV Transmission Line Tension Tower Wu, Tian (wutian_08@163.com), 1600, Science Press (47): : 3863 - 3871
- [46] Electromagnetic Radiation Characteristics of Potential Transfer Arc During Live Working on 1 000 kV AC Transmission Line Tension Tower Gaodianya Jishu/High Voltage Engineering, 2022, 48 (11): : 4628 - 4637
- [47] Experimental test on corona characteristics of rigid jumper for 1 000 kV UHVAC double circuit transmission lines on the same tower Dianwang Jishu/Power System Technology, 2014, 38 (03): : 802 - 806
- [48] Radio interference and electric field of 500 kV four circuits on one tower transmission line Gaodianya Jishu/High Voltage Engineering, 2007, 33 (03): : 113 - 116
- [49] Calculation of inductive voltage and current for 500 kV double circuits transmission lines on single tower Gaodianya Jishu/High Voltage Engineering, 2008, 34 (09): : 1927 - 1931
- [50] Analysis of Safety Protection Measures for Maintenance Work of 500 kV Double-Circuit Transmission Lines on Same Tower 2017 2ND ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2017), 2017, 199