Improved PSO algorithm for multi-objective optimization flexible job shop scheduling problems

被引:0
|
作者
Bai, Junjie [1 ]
Wang, Ningsheng [1 ]
Tang, Dunbing [1 ]
机构
[1] CMS Research Centre, Nanjing University of Aeronautics and Astronautics, Nanjing, 210016, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:447 / 453
相关论文
共 50 条
  • [31] A Hybrid Optimization Algorithm for Multi-objective Flexible Job-shop
    Zhang Xiu-li
    Huang Yue
    Liu Nian
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 1524 - 1530
  • [32] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [33] An efficient search method for multi-objective flexible job shop scheduling problems
    Xing, Li-Ning
    Chen, Ying-Wu
    Yang, Ke-Wei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (03) : 283 - 293
  • [34] An efficient search method for multi-objective flexible job shop scheduling problems
    Li-Ning Xing
    Ying-Wu Chen
    Ke-Wei Yang
    Journal of Intelligent Manufacturing, 2009, 20 : 283 - 293
  • [35] PRODUCTION MANAGEMENT OF MULTI-OBJECTIVE FLEXIBLE JOB-SHOP BASED ON IMPROVED PSO
    Mao, C. L.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2021, 20 (02) : 422 - 433
  • [36] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [37] A Collaborative Evolutionary Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, X. Y.
    Gao, L.
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 997 - 1002
  • [38] Multi-objective fuzzy flexible job shop scheduling using memetic algorithm
    Wang, Chun
    Tian, Na
    Ji, Zhicheng
    Wang, Yan
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2017, 87 (14) : 2828 - 2846
  • [39] Due date optimization in multi-objective scheduling of flexible job shop production
    Ojstersek, R.
    Tang, M.
    Buchmeister, B.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2020, 15 (04): : 481 - 492
  • [40] Improved NSGA2 Algorithm to Solve Multi-Objective Flexible Job Shop Scheduling Problem
    Liang, Xu
    Liu, Yifan
    Huang, Ming
    2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 22 - 25