Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

被引:0
|
作者
Berthélemy, Michel [1 ,2 ]
Escobar Rangel, Lina [2 ]
机构
[1] Institut de technico-économie des systemes énergétiques (I-tésé), Commissariat a l'Energie Atomique, Université Paris Saclay, Gif-sur-Yvette Cedex,91191, France
[2] Centre d'Economie Industrielle, École des Mines de Paris, PSL Research University, Paris,75006, France
关键词
Nuclear reactors - Cost benefit analysis;
D O I
暂无
中图分类号
学科分类号
摘要
This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. © 2015 Elsevier Ltd.
引用
收藏
页码:118 / 130
相关论文
共 26 条