共 50 条
- [32] Optimal Operation of Parallel Reservoirs System with Limited Storage Capacity for Flood Mitigation ADVANCES IN HYDROINFORMATICS: MODELS FOR COMPLEX AND GLOBAL WATER ISSUES-PRACTICES AND EXPECTATIONS, 2022, : 1051 - 1064
- [33] Study on synergetic control of flood operating water levels of cascade reservoirs in the downstream reach of the Jinsha River basin Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (06): : 633 - 643
- [34] The multi-objective and joint operation of Xiluodu cascade and Three Gorges cascade reservoirs system Zhongguo Kexue Jishu Kexue/Scientia Sinica Technologica, 2017, 47 (08): : 823 - 831
- [35] Theory and method of design flood in cascade reservoir operation period 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (31): : 734 - 745
- [37] Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China JOURNAL OF FLOOD RISK MANAGEMENT, 2022,
- [38] Risk Analysis Method for Flood Control Operation of Cascade Reservoirs Considering Prediction Error PROCEEDINGS OF THE 3RD 2017 INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT (ICSD 2017), 2017, 111 : 30 - 37
- [39] Study on joint flood control operation for leading reservoirs in the upper Changjiang River Shuili Xuebao/Journal of Hydraulic Engineering, 2013, 44 (01): : 59 - 66
- [40] Research on ecological impacts of the joint operation of cascade reservoirs in the upstream of the Yellow River Shuili Xuebao/Journal of Hydraulic Engineering, 2018, 49 (10): : 1187 - 1198