共 50 条
- [31] Cutter Layout Design for Tunnel Boring Machine (TBM) using Fuzzy Collaborative Optimization Model 2017 13TH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY (ICNC-FSKD), 2017,
- [32] Air Conditioning and Dust Collecting at a Double-Stage, Full-Face Tunnel Boring Machine. Gluckauf: Die Fachzeitschrift fur Rohstoff, Bergbau und Energie, 1973, 109 (20): : 988 - 989
- [33] DESIGN, DEVELOPMENT, AND VERIFICATION OF A LOVAT 7.6-METER FULL-FACE TUNNEL-BORING MACHINE CIM BULLETIN, 1984, 77 (865): : 47 - 54
- [34] Analysis of the mechanic model of cutterhead bearing of a full face rock tunnel boring machine Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2010, 18 (SUPPL. 1): : 225 - 232
- [35] Numerical Simulation of Rock Breaking by Disc Cutter of Tunnel Boring Machine PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 888 - +
- [36] Research on the Load on Cutter Head of Hard Rock Tunnel Boring Machine PROCEEDINGS OF 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND MECHANICAL ENGINEERING, 2014, 684 : 303 - 307
- [37] Stress and wear analysis of the disc cutter of rock tunnel boring machine Open Mechanical Engineering Journal, 2015, 9 (01): : 721 - 725
- [38] The reliability factor analysis of rock tunnel boring machine cutter system MECHATRONICS, ROBOTICS AND AUTOMATION, PTS 1-3, 2013, 373-375 : 2082 - +
- [40] Risk analysis and geologic survey before construction by a full face rock tunnel boring machine Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2007, 15 (02): : 171 - 176