Predictive railway maintenance based on statistical analysis of track geometric parameters

被引:0
|
作者
Insa, R. [1 ]
Salvador, P. [1 ]
Inarejos, J. [1 ]
机构
[1] Department of Transport Engineering and Infrastructure, Valencia Technical University, Spain
来源
Civil-Comp Proceedings | 2012年 / 98卷
关键词
Railroads - Defects - Railroad transportation - Surveys;
D O I
10.4203/ccp.98.48
中图分类号
学科分类号
摘要
The current trends in transport require more competitive and self-financing transport modes hence railway companies must fulfil the criteria by lowering their expenditure and still meet the customers' requirements. This paper proposes a methodology for track maintenance with the aim of being able to perform maintenance works only when they are strictly necessary while keeping safety and comfort levels. Such a methodology is based on a predictive maintenance philosophy and on a statistical approach. The characterisation of the track defects by means of probability functions, the obtaining of the most appropriate measuring step for data study and the temporal analysis of consecutive track surveys are discussed in the present research. Finally the paper provides some promising results. © Civil-Comp Press, 2012
引用
收藏
相关论文
共 50 条
  • [41] Evaluation and prediction method for railway track geometric state based on probability distribution change
    Wang, Jianxi
    Li, Haifeng
    Xu, Yude
    Zhongguo Tiedao Kexue/China Railway Science, 2008, 29 (05): : 31 - 34
  • [42] A Statistical Approach to Reduce Failure Facilities Based on Predictive Maintenance
    Shimada, Junya
    Sakajo, Satoko
    2016 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2016, : 5156 - 5160
  • [43] Design, construction and maintenance or organization of a modem railway track
    Giannakos, KS
    Geotechnics in Pavement and Railway Design and Construction, 2004, : 217 - 224
  • [44] Allocation of effective maintenance limit for railway track geometry
    Khajehei, Hamid
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) : 1597 - 1612
  • [45] The impact of summer heatwaves on railway track geometry maintenance
    Davies, Ben
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2021, 235 (09) : 1158 - 1171
  • [46] Railway track availability modelling with opportunistic maintenance practice
    Davies, Ben
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2022, 236 (08) : 907 - 919
  • [47] Optimal scheduling of track maintenance activities for railway networks
    Su, Zhou
    De Schutter, Bart
    IFAC PAPERSONLINE, 2018, 51 (09): : 386 - 391
  • [48] Distributed Optimization for Railway Track Maintenance Operations Planning
    Faris, Muhammad
    Nunez, Alfredo
    Su, Zhou
    De Schutter, Bart
    2018 21ST INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2018, : 1194 - 1201
  • [49] Measurement, analysis, and model updating based on the modal parameters of high-speed railway ballastless track
    Gao, Liang
    An, Bolun
    Xin, Tao
    Wang, Ji
    Wang, Pu
    MEASUREMENT, 2020, 161
  • [50] Systematic Literature Review on Data-Driven Models for Predictive Maintenance of Railway Track: Implications in Geotechnical Engineering
    Xie, Jiawei
    Huang, Jinsong
    Zeng, Cheng
    Jiang, Shui-Hua
    Podlich, Nathan
    GEOSCIENCES, 2020, 10 (11) : 1 - 24