共 50 条
- [31] HANDLING A DESIGN STRUCTURE MATRIX BASED ON FUZZY DATA GAIN COMPETITIVE ADVANTAGE BY MANAGING COMPLEXITY, 2012, : 195 - +
- [33] Schedule Collaborative Optimization for the Engineering Project Based on Stackelberg ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 64 - 71
- [34] Schedule Planning Control of Software Project based on PSP PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME), 2016, 71 : 847 - 850
- [35] Research on Software Project Schedule Based on Critical Chain 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
- [36] Dynamic safety evaluation based on project network schedule PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 1922 - 1926
- [37] Dynamic safety evaluating based on project network schedule Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology, 2002, 24 (02):
- [38] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273
- [39] A FRAMEWORK FOR ENHANCED PROJECT SCHEDULE DESIGN TO AID PROJECT MANAGER'S DECISION MAKING PROCESSES 23RD EUROPEAN MODELING & SIMULATION SYMPOSIUM, EMSS 2011, 2011, : 516 - 525
- [40] Design of Variable Cycle Engine Acceleration Control Schedule Based on Gradient Method and Maximum Entropy Method Tuijin Jishu/Journal of Propulsion Technology, 43 (05): : 50 - 58