Fuzzy optimization of construction engineering project schedule based on critical chain management

被引:0
|
作者
机构
[1] [1,Liu, Jianbing
[2] Ren, Hong
[3] Du, Junshu
来源
Liu, J. (Liujb71@sina.cn) | 2013年 / Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia卷 / 11期
关键词
Chains - Highway bridges - Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Critical chain management was the very important theory innovation in the development of construction project schedule management field in recent years. Compared with the traditional methods of construction project schedule management, the methods of critical chain management considered resource constraints into construction project schedule management, the construction project cycle was shortened and the efficiency was enhanced by using the dynamic thinking and circulation pattern to manage whole project. In view of the progress of critical chain management of the article, fuzzy theory was used to calculate and optimize the buffer zone sizes with the determination of the buffer size of the existing resources in certain critical chain management so as to shorten the cycle. © 2013 Universitas Ahmad Dahlan.
引用
收藏
相关论文
共 50 条
  • [21] Monitoring and controlling engineering projects with blockchain-based critical chain project management
    Bahnas, Nermeen
    Adel, Kareem
    Khallaf, Rana
    Elhakeem, Ahmed
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [22] Toward Lean Construction through Critical Chain Project Management and Root Cause Analysis in a Construction Project
    Usman, Indrianawati
    Rendy, Oktaviano
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON ORGANIZATIONAL INNOVATION (ICOI 2017), 2017, 131 : 153 - 158
  • [23] Schedule quality evaluation for Construction Project Management
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2020, 20 : 175 - 183
  • [24] Research on Schedule Planning Management of Railway Construction Project Based on CAS
    Zhao, Xiang-dong
    LIan, Hao
    Zhang, Dong-sheng
    MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 2560 - +
  • [25] Construction project management based on agile supply chain
    Zhang Hong
    Wang Dan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 614 - 615
  • [26] A framework of critical resource chain for project schedule analysis
    Liu Shu-Shun
    Shih, Kuo-Chuan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (09) : 857 - 869
  • [27] A Model of Engineering Project Management Based on Supply Chain
    Wu Chengfeng
    Zhang Qingpu
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 316 - 319
  • [28] THE ADVANTAGES OF USING CRITICAL CHAIN PROJECT MANAGEMENT IN PLANNING CONSTRUCTION PROJECTS
    Deac, Vasile
    Vrincut, Mihai
    METALURGIA INTERNATIONAL, 2010, 15 : 54 - 58
  • [29] Improved Critical Chain Project Management Framework for Scheduling Construction Projects
    Ma, Guofeng
    Wang, Aimin
    Li, Nan
    Gu, Lingyun
    Ai, Qi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (12)
  • [30] Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation
    宋洋
    钟炜
    Transactions of Tianjin University, 2007, (02) : 131 - 136