Evaluting short-term financial risk based on Delta model for hydropower plants

被引:0
|
作者
Li, Ming [1 ]
Zhang, Qiang [1 ]
Si, Yang [1 ]
机构
[1] Qinghai University, Xining 810016, China
关键词
Electric industry - Risk assessment - Uncertainty analysis - Hydroelectric power plants - Costs - Hydroelectric power - Value engineering;
D O I
暂无
中图分类号
学科分类号
摘要
It is important for hydropower plants to assess the risk from the uncertainty of inflow and power price in the electricity market. Considering electricity price risk caused by bidding price and energy-uncertainty risk caused by season factors that influence the profit of hydropower plants and their pertinence, this paper puts forword variance-covariance parameter approach of value at risk(VaR) combining the concrete example to assess the short-term financial risk for income of the certain hydropower plants. The analysis shows that variance-covariance parameter approach can forecast precisely clearing price of bidding units the day after to lay a good foundation for decline return risk of hydropower plants.
引用
收藏
页码:12 / 15
相关论文
共 50 条
  • [21] Short-Term Power Forecasting Model for Photovoltaic Plants Based on Historical Similarity
    Monteiro, Claudio
    Santos, Tiago
    Alfredo Fernandez-Jimenez, L.
    Ramirez-Rosado, Ignacio J.
    Sonia Terreros-Olarte, M.
    ENERGIES, 2013, 6 (05): : 2624 - 2643
  • [22] A Short-Term Power Forecasting Model for Photovoltaic Plants Based on Data Mining
    Zhou, Hui
    Xue, Chi
    Cao, HongBin
    Xu, Weiwei
    Gu, Xiang
    Wang, Jin
    PROCEEDINGS OF 2017 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER AND COMMUNICATIONS (ICCC), 2017, : 2873 - 2878
  • [23] An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids
    Cheng, Chuntian
    Su, Chengguo
    Wang, Peilin
    Shen, Jianjian
    Lu, Jianyu
    Wu, Xinyu
    ENERGY, 2018, 163 : 722 - 733
  • [24] Credit Risk Assessment Based on Long Short-Term Memory Model
    Zhang, Yishen
    Wang, Dong
    Chen, Yuehui
    Shang, Huijie
    Tian, Qi
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2017, PT II, 2017, 10362 : 700 - 712
  • [25] A support vector machine based MSM model for financial short-term volatility forecasting
    Baohua Wang
    Hejiao Huang
    Xiaolong Wang
    Neural Computing and Applications, 2013, 22 : 21 - 28
  • [26] A support vector machine based MSM model for financial short-term volatility forecasting
    Wang, Baohua
    Huang, Hejiao
    Wang, Xiaolong
    NEURAL COMPUTING & APPLICATIONS, 2013, 22 (01): : 21 - 28
  • [27] Research on short-term disease risk prediction based on long short-term memory
    Feng, Yanjun
    Wang, Hongxia
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2021, 128 : 176 - 176
  • [28] Short-Term Peak-Shaving Operation of Head-Sensitive Cascaded Hydropower Plants Based on Spillage Adjustment
    Liao, Shengli
    Zhang, Yan
    Liu, Benxi
    Liu, Zhanwei
    Fang, Zhou
    Li, Shushan
    WATER, 2020, 12 (12) : 1 - 19
  • [29] An MILP model based on a processing strategy of complex multisource constraints for the short-term peak shaving operation of large-scale cascaded hydropower plants
    Fang, Zhou
    Liao, Shengli
    Zhao, Hongye
    Cheng, Chuntian
    Liu, Benxi
    Wang, Huan
    Li, Shushan
    RENEWABLE ENERGY, 2024, 231
  • [30] Optimization Model for the Short-Term Operation of Hydropower Plants Transmitting Power to Multiple Power Grids via HVDC Transmission Lines
    Su, Chengguo
    Cheng, Chuntian
    Wang, Peilin
    Shen, Jianjian
    IEEE ACCESS, 2019, 7 : 139236 - 139248