Evaluting short-term financial risk based on Delta model for hydropower plants

被引:0
|
作者
Li, Ming [1 ]
Zhang, Qiang [1 ]
Si, Yang [1 ]
机构
[1] Qinghai University, Xining 810016, China
关键词
Electric industry - Risk assessment - Uncertainty analysis - Hydroelectric power plants - Costs - Hydroelectric power - Value engineering;
D O I
暂无
中图分类号
学科分类号
摘要
It is important for hydropower plants to assess the risk from the uncertainty of inflow and power price in the electricity market. Considering electricity price risk caused by bidding price and energy-uncertainty risk caused by season factors that influence the profit of hydropower plants and their pertinence, this paper puts forword variance-covariance parameter approach of value at risk(VaR) combining the concrete example to assess the short-term financial risk for income of the certain hydropower plants. The analysis shows that variance-covariance parameter approach can forecast precisely clearing price of bidding units the day after to lay a good foundation for decline return risk of hydropower plants.
引用
收藏
页码:12 / 15
相关论文
共 50 条
  • [1] A CompactMILP Model for Short-Term Peak Shaving of Cascaded Hydropower Plants ConsideringUnitCommitment
    Su C.
    Wang P.
    Wu X.
    Cheng C.
    Wang J.
    Wu, Xinyu (wuxinyu@dlut.edu.cn), 1883, Power System Technology Press (42): : 1883 - 1891
  • [2] Short-term operation model for coupled hydropower reservoirs
    Teegavarapu, Ramesh S.V.
    Simonovic, Slobodan P.
    Journal of Water Resources Planning and Management, 2000, 126 (02) : 98 - 106
  • [3] Hybrid Model for Short-Term Scheduling of Hydropower Systems
    Hidalgo, Ieda G.
    Correia, Paulo B.
    Arnold, Francisco J.
    Estrocio, Joao Paulo F.
    de Barros, Regiane S.
    Fernandes, Jessica P. T.
    Yeh, William W. -G.
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (03)
  • [4] Short-term operation model for coupled hydropower reservoirs
    Teegavarapu, RSV
    Simonovic, SP
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (02): : 98 - 106
  • [5] Refined Scheduling Based on Dynamic Capacity Model for Short-term Hydropower Generation
    Zhang, Rongqi
    Zhang, Shanghong
    Wen, Xiaoxiong
    Jing, Zhu
    WATER RESOURCES MANAGEMENT, 2023, 37 (01) : 21 - 35
  • [6] Refined Scheduling Based on Dynamic Capacity Model for Short-term Hydropower Generation
    Rongqi Zhang
    Shanghong Zhang
    Xiaoxiong Wen
    Zhu Jing
    Water Resources Management, 2023, 37 : 21 - 35
  • [7] Short-term forecasting model for aggregated regional hydropower generation
    Monteiro, Claudio
    Ramirez-Rosado, Ignacio J.
    Alfredo Fernandez-Jimenez, L.
    ENERGY CONVERSION AND MANAGEMENT, 2014, 88 : 231 - 238
  • [8] A Practical Short-term Scheduling Model for Cascade Hydropower Reservoirs
    Feng, Yu
    Zhong, Jian
    Lu, Peng
    FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY V, 2015, : 1269 - 1276
  • [9] A Short-Term Hydropower Scheduling Model Considering Constraint Priorities
    Wu, Xinyu
    Wu, Yiyang
    Cheng, Xilong
    Cheng, Chuntian
    Li, Zehong
    Wu, Yongqi
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2023, 149 (09)
  • [10] An MILP Model for Short-term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment
    Su, Chengguo
    Cheng, Chuntian
    Wang, Peilin
    2018 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2018 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2018,