共 50 条
- [41] Stability analysis of diversion tunnels in Jinping II hydropower station project PHYSICAL AND NUMERICAL SIMULATION OF MATERIALS PROCESSING, PTS 1 AND 2, 2008, 575-578 : 1287 - 1292
- [43] Engineering geological problems related to high geo-stresses at the Jinping I Hydropower Station, Southwest China Bulletin of Engineering Geology and the Environment, 2010, 69 : 373 - 380
- [45] Microseismic monitoring system establishment and its engineering applications to left bank slope of Jinping I Hydropower Station Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (05): : 915 - 925
- [50] Seepage Calculation and Analysis of the Upstream Earth-Rock Cofferdam of the Pinecone Hydropower Station PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2017 - +