共 50 条
- [31] Bi-level programming model and algorithm of passenger train operation plan Zhongguo Tiedao Kexue/China Railway Science, 2007, 28 (03): : 110 - 116
- [32] Research in Model Testing Pier-Foundation Hysteretic Property in Passenger Dedicated Line ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION, PTS 1 AND 2, 2011, 37-38 : 949 - 952
- [33] Modeling and solving the crew scheduling problem of passenger dedicated line Tiedao Xuebao/Journal of the China Railway Society, 2009, 31 (01): : 15 - 19
- [35] BEHAVIOR OF TIANXINGZHOU YANGTZE BRIDGE OF WUGUANG PASSENGER DEDICATED LINE 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 581 - 586
- [37] Study on Train Running and Control Simulation of Railway Passenger Dedicated Line Based on Agent TRAFFIC AND TRANSPORTATION STUDIES, 2008, : 728 - 742
- [38] Estimating of the Distribution Rate of Passenger Flow on Shenyang-Dalian Railway after Operation of Passenger Dedicated Line SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1581 - 1585
- [39] Study on Construction and Operation of the Passenger Dedicated Railway Line in the Process of China's Urbanization URBANIZATION AND LAND RESERVATION RESEARCH, 2009, : 1 - +
- [40] Study on Camber Deformation and Safety Countermeasures of Shanghai-Hangzhou Passenger Dedicated Line PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 2052 - 2056