RIS-Assisted Transmission Scheduling for Train-to-Train Communication System

被引:0
|
作者
Li, Wenqing [1 ]
Ai, Bo [1 ]
Niu, Yong [1 ]
Han, Zhu [2 ,3 ]
Wang, Ning [4 ]
Zhong, Zhangdui [1 ]
He, Ruisi [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Elect & Informat Engn, Beijing 100044, Peoples R China
[2] Univ Houston, Dept Elect & Comp Engn, Houston, TX 77004 USA
[3] Kyung Hee Univ, Dept Comp Sci & Engn, Seoul 446701, South Korea
[4] Zhengzhou Univ, Sch Informat Engn, Zhengzhou 450001, Peoples R China
基金
北京市自然科学基金; 日本科学技术振兴机构; 中国国家自然科学基金;
关键词
Millimeter wave communication; Reconfigurable intelligent surfaces; Rail transportation; Quality of service; Scheduling algorithms; Optimization; Job shop scheduling; MmWave; high speed railway (HSR); reconfigurable intelligent surface (RIS); train-to-train communication; RECONFIGURABLE INTELLIGENT SURFACE; 5G; ALLOCATION; NETWORKS;
D O I
10.1109/TVT.2024.3405947
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Millimeter wave (mmWave) has been considered as an enabler to alleviate the spectrum shortage problem while providing high data rates in high speed railway (HSR) communications. However, a mmWave channel has a larger path loss, and therefore is sensitive to blockage. In such a high speed mobile environment with fast-changing channels, considering the characteristics of mmWave, how to achieve reliable transmission scheduling in a train-to-train communication has become a critical issue, especially from the safety point of view. In this paper, we investigate a mmWave train-to-train communication system with the fixed frame structure, where two trains communicate with each other directly by mobile relays (MRs) deployed on top of cabin roofs. Due to the limited communication distance by MRs and the nature that mmWave is prone to blockage, reconfigurable intelligent surface (RIS) is placed between two trains to rebuild line of sight (LoS) link when original link is blocked or beyond the distance range. We aim to maximize the number of completely scheduled flows with different quality of service (QoS) requirements via optimizing the discrete phase shifts of RIS as well as flow scheduling. In particular, we consider multiple-frame scheduling to make use of the predictability of trains' trajectory. To solve this nonlinear integer programming problem, we decompose the joint scheduling problem into two subproblems. We first optimize the discrete phase shifts of RIS, and then build an interference-based graph of flows while transforming the transmission constraints into interference relationships. The goal of the problem can be realized through the proposed scheduling algorithm. Finally, simulation results show that the proposed algorithm outperforms three baseline schemes in the literature in terms of the number of the completely scheduled flows and system throughput.
引用
收藏
页码:15020 / 15033
页数:14
相关论文
共 50 条
  • [21] Next Generation Train-Centric Communication-Based Train Control System with Train-to-Train (T2T) Communications
    Wang, Xiaoxuan
    Liu, Lingjia
    Tang, Tao
    Zhu, Li
    2018 INTERNATIONAL CONFERENCE ON INTELLIGENT RAIL TRANSPORTATION (ICIRT), 2018,
  • [22] Time Synchronization Method for Train-to-Train Communication Based on Model Predictive Control
    Chen Y.
    Zhan Z.
    Zhang W.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (05): : 111 - 122
  • [23] Analysis of a RIS-Assisted Wireless Communication System with AWGGN
    Gumus, Damla
    Bilim, Mehmet
    2022 30TH SIGNAL PROCESSING AND COMMUNICATIONS APPLICATIONS CONFERENCE, SIU, 2022,
  • [24] Intelligent spectrum sharing for train-to-train communication based on deep reinforcement learning
    Zhao, Junhui
    Chen, Yao
    Zhang, Qingmiao
    Journal of Railway Science and Engineering, 2022, 19 (03) : 841 - 848
  • [25] Robust Transmission Design for RIS-Assisted Integrated Sensing and Communication Systems
    Xu, Yongqing
    Li, Yong
    Quek, Tony Q. S.
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2024, 73 (11) : 17151 - 17164
  • [26] Parametrization and Validation of the Geometry-Based Stochastic Channel Model for Train-to-Train Communication
    Unterhuber, Paul
    Walter, Michael
    Kuerner, Thomas
    2023 17TH EUROPEAN CONFERENCE ON ANTENNAS AND PROPAGATION, EUCAP, 2023,
  • [27] Transmission Design of Active RIS-assisted Integrated Sensing and Communication Systems
    Mao, Weihao
    Xiong, Ke
    Lu, Yang
    You, Jia
    Ai, Bo
    Ding, Zhiguo
    ICC 2023-IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS, 2023, : 4230 - 4235
  • [28] ITS-G5 Channel Models for High Speed Train-to-Train Communication
    Unterhuber, Paul
    Soliman, Mohammad
    Lehner, Andreas
    COMMUNICATION TECHNOLOGIES FOR VEHICLES, NETS4CARS/NETS4TRAINS/NETS4AIRCRAFT 2017, 2017, 10222 : 72 - 83
  • [29] RIS-Assisted Covert Transmission in Satellite-Terrestrial Communication Systems
    Song, Da
    Yang, Ziyi
    Pan, Gaofeng
    Wang, Shuai
    An, Jianping
    IEEE INTERNET OF THINGS JOURNAL, 2023, 10 (22) : 19415 - 19426
  • [30] Transmission Mode Selection in RIS-Assisted Communication Networks<bold> </bold>
    Abdulshakoor, Ahmed, I
    Abu Alit, Najah
    Hassanein, Hossam S.
    2024 IEEE CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING, CCECE 2024, 2024, : 123 - 124