共 37 条
- [32] Time-History Analysis of Seismic Performance of Metro Station by Top-Down Boring with Cast-in-Situ Arch ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 2216 - +
- [34] Deformation Research of Temporary Road and Bridge System in Semi Top-down Pit with Gradual Width ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1715 - +
- [35] Damage analysis and deformation early warning of surrounding rock mass during top arch excavation of underground powerhouse of Shuangjiangkou hydropower station Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 (12): : 2512 - 2524
- [37] Experimental study on shear-resistance properties of the concrete-filled steel tubular frame joint of Gong Yuan Qian station of Guangzhou Metro constructed by cut-cover and top-down method Jianzhu Jiegou Xuebao/Journal of Building Structures, 2000, 21 (02): : 20 - 27