共 50 条
- [31] Research on the Key Technology of Suspender Replacement of Long-span Concrete-filled Steel Tubular Arch Bridge Journal of Railway Engineering Society, 2021, 38 (12): : 61 - 67
- [33] Construction Simulation of Long-Span Arch Rib Bridge ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 871 - +
- [34] Analysis of reliability numerical simulation of long-span steel trussed arch bridge in construction stage PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 776 - 779
- [35] Geometry Control Method Based on Stress-Free State Theory for Long-Span Concrete-Filled Steel Tube Arch Bridge Bridge Construction, 2020, 50 (06): : 20 - 26
- [36] Analysis of suspension cable force of large-span steel tube concrete tied arch bridge Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (17): : 306 - 313
- [37] Study on the Long-span Cable-stayed Bridge Composite Beam Hoisting Construction Technology in China 2015 2nd International Conference on Education and Education Research (EER 2015), Pt 3, 2015, 7 : 141 - 146
- [38] Sensitivity analysis on dynamic properties of large span concrete-filled steel tube arch bridge PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1976 - 1979
- [39] ANALYSIS OF DYNAMIC CHARACTERISTICS OF CABLE-SUPPORTED CONCRETE-FILLED STEEL TUBE ARCH BRIDGE PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1712 - 1715
- [40] Slab style selection of long-span concrete filled steel tubular arch bridges Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 11 (02): : 59 - 63