共 50 条
- [31] Robust layout of floor shop based on improved shuffled frog leaping algorithm Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2014, 20 (08): : 1879 - 1886
- [34] A Fast Shuffled Frog Leaping Algorithm 2013 NINTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION (ICNC), 2013, : 369 - 373
- [35] An improved shuffled frog leaping algorithm Journal of Information and Computational Science, 2013, 10 (06): : 1665 - 1673
- [36] Distributed assembly hybrid flow shop scheduling based on shuffled frog leaping algorithm with Q-learning Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2023, 51 (12): : 37 - 44
- [37] An improved Shuffled Frog Leaping Algorithm Jiang, J. (jjg3306@126.com), 2013, Binary Information Press, Flat F 8th Floor, Block 3, Tanner Garden, 18 Tanner Road, Hong Kong (10):
- [38] An improved shuffled frog leaping algorithm and its application in permutation flow shop scheduling problem in machine fault conditions PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON COMPUTERS & INFORMATICS, 2015, 13 : 983 - 990
- [40] Shuffled Frog-leaping Algorithm Based Batch Scheduling in Semiconductor Furnace 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 2717 - 2722