Damage detection of cable-stayed bridge based on RBF neural networks

被引:0
|
作者
Key Laboratory for Bridge and Tunnel of Shaanxi Province, Chang'an University, Xi'an 710064, China [1 ]
不详 [2 ]
机构
来源
Chang'an Daxue Xuebao | 2006年 / 1卷 / 49-53期
关键词
6;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] CONVERSION OF A SUSPENSION BRIDGE INTO A CABLE-STAYED BRIDGE
    BUCKLAND, PG
    MORGENSTERN, BD
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (02) : 273 - 281
  • [32] Damage Localization and Severity Assessment of a Cable-Stayed Bridge Using a Message Passing Neural Network
    Son, Hyesook
    Pham, Van-Thanh
    Jang, Yun
    Kim, Seung-Eock
    SENSORS, 2021, 21 (09)
  • [33] Cable damage identification of cable-stayed bridge using multi-layer perceptron and graph neural network
    Pham, Van-Thanh
    Jang, Yun
    Park, Jong-Woong
    Kim, Dong-Joo
    Kim, Seung-Eock
    STEEL AND COMPOSITE STRUCTURES, 2022, 44 (02): : 227 - 240
  • [34] Based modal analysis evaluation of a cable-stayed bridge
    Escobar, JA
    Gómez, R
    Murià-Vila, D
    Sánchez-Ramírez, R
    IMAC-XVIII: A CONFERENCE ON STRUCTURAL DYNAMICS, VOLS 1 AND 2, PROCEEDINGS, 2000, 4062 : 821 - 826
  • [35] Based modal analysis evaluation of a cable-stayed bridge
    Escobar, J.Alberto
    Gomez, Roberto
    Muria-Vila, David
    Sanchez-Ramirez, Roberto
    Proceedings of the International Modal Analysis Conference - IMAC, 2000, 1 : 821 - 826
  • [36] MONTREAL BOASTS CABLE-STAYED BRIDGE
    DEMERS, JG
    SIMONSEN, OF
    CIVIL ENGINEERING, 1971, 41 (08): : 59 - &
  • [37] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [38] JAPANESE CABLE-STAYED BRIDGE DESIGN
    BURDEN, AR
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 1021 - 1051
  • [39] DYNAMIC BEHAVIOR OF A CABLE-STAYED BRIDGE
    FLEMING, JF
    EGESELI, EA
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1980, 8 (01): : 1 - 16
  • [40] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    Better Roads, 2004, 74 (02): : 94 - 97