共 50 条
- [32] Application of fuzzy synthetic evaluation model based on entropy and G1 method in project management contract evaluation Proceedings of 2007 International Conference on Management Science & Engineering (14th) Vols 1-3, 2007, : 2284 - 2292
- [33] An improved GM(1,1) model based on weighted MSE and optimal weighted background value and its application SCIENTIFIC REPORTS, 2024, 14 (01):
- [37] The optimized grey model GM(1, N) based on the development trends of driving variables and its application 2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 235 - 240