Time series forecast of foundation pit deformation based on LSSVM-ARMA model

被引:0
|
作者
机构
[1] Cao, Jing
[2] Ding, Wen-Yun
[3] Zhao, Dang-Shu
[4] Song, Zhi-Gang
[5] Liu, Hai-Ming
来源
Cao, Jing | 1600年 / Academia Sinica卷 / 35期
关键词
Auto-regressive moving average model (ARMA) - FORECAST model - Foundation pit engineering - Foundation pits - Horizontal displacements - Least squares support vector machines - PSO-LSSVM - Time series forecasts;
D O I
暂无
中图分类号
学科分类号
摘要
It is difficult to forecast and control the deformation of foundation pit engineering. A time series forecast method of foundation pit deformation based on wavelet transform, least squares support vector machine (LSSVM) optimized by particle swarm optimization (PSO) and autoregressive moving average model (ARMA) is proposed. Firstly, the foundation pit deformation series is decomposed and reconstructed into trend series and random series. Secondly, the trend series future values are forecasted by PSO-LSSVM model; while the random series future values are forecasted by ARMA model. Finally, the sum of trend series and random series future values are used as the final forecast value. This method is used to forecast the deep horizontal displacement of a foundation pit in Kunming. Wherein, the latest measured data of early working stage is used to build forecast model; and the model is used to forecast the later working stage deformation. The result is satisfied. ©, 2014, Academia Sinica. All right reserved.
引用
收藏
相关论文
共 50 条
  • [31] The financial time series forecasting based on proposed ARMA-GRNN model
    Li, WM
    Liu, JW
    Le, JJ
    Wang, XR
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 2005 - 2009
  • [32] INTELLIGENT INVERSION METHOD OF GEOTECHNICAL PARAMETERS OF FOUNDATION PIT ENGINEERING BASED ON BFOA-LSSVM
    Zhao, Jianbo
    Zheng, Shuai
    Dong, Sihui
    Zheng, Xiaodong
    Zhu, Ziming
    Pang, Yanzhi
    Journal of GeoEngineering, 2024, 19 (04): : 150 - 159
  • [33] Air quality secondary forecast model based on ARIMA time series model
    Yuan, Xiqian
    Yang, Mengqi
    Sun, Tingkun
    Li, Xindong
    2023 3RD ASIA-PACIFIC CONFERENCE ON COMMUNICATIONS TECHNOLOGY AND COMPUTER SCIENCE, ACCTCS, 2023, : 310 - 313
  • [34] An Analytical Model For Residual Stress Prediction In Rebound Deformation Of The Foundation Pit
    Do Minh Ngoc
    Nguyen Thi Nu
    Do Minh Tinh
    Bui Van Loi
    Ngo Thi Thanh Huong
    JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2020, 23 (04): : 661 - 668
  • [35] MODWT-ARMA model for time series prediction
    Zhu, Li
    Wang, Yanxin
    Fan, Qibin
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (5-6) : 1859 - 1865
  • [36] ARMA MODEL IDENTIFICATION OF HYDROLOGIC TIME-SERIES
    SALAS, JD
    OBEYSEKERA, JTB
    WATER RESOURCES RESEARCH, 1982, 18 (04) : 1011 - 1021
  • [37] Model tests on deformation characteristics of foundation pit at Luoyang Railway Station
    Mu H.-D.
    Deng Y.-H.
    Zhang W.-D.
    Song D.-Y.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 : 198 - 203
  • [38] An Atmospheric Particulate Matter Forecast Model Based on Time Series Data
    Bao, Li-qun
    Li, Quan
    2021 13TH INTERNATIONAL CONFERENCE ON COMMUNICATION SOFTWARE AND NETWORKS (ICCSN 2021), 2021, : 237 - 241
  • [39] Forecast model for financial time series: An approach based on harmonic oscillators
    Garcia, M. M.
    Pereira, A. C. Machado
    Acebal, J. L.
    de Magalhaes, A. R. Bosco
    PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2020, 549
  • [40] Use of time series models to forecast the evolution of corrosion pit in steel rebars
    Xu Yidong
    FUNCTIONAL MATERIALS, 2016, 23 (03): : 457 - 462