共 50 条
- [42] A deadlock-free scheduling with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (5-6): : 593 - 602
- [45] Scheduling unrelated parallel machines with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
- [46] Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (7-8): : 795 - 808
- [47] Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms The International Journal of Advanced Manufacturing Technology, 2009, 44 : 795 - 808
- [48] Iterated hybrid metaheuristic algorithms for unrelated parallel machines problem with unequal ready times and sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2012, 60 : 693 - 705