Reason analysis and treatment for concrete material cracks of tunnel lining

被引:1
|
作者
Zhang, B. [1 ,2 ]
Fan, S. [1 ]
Deng, J. [2 ]
机构
[1] School of Geoscience and Technology, Southwest Petroleum University, Chengdu, Sichuan,610500, China
[2] State Key Laboratory of Hydraulic and Mountain River Engineering, Sichuan University, Chengdu, Sichuan,610065, China
关键词
Quality management - Safety engineering - Cracks - Highway administration - Tunnel linings - Strength of materials;
D O I
10.1179/1432891715Z.0000000002126
中图分类号
学科分类号
摘要
In the construction of highway tunnels, the lining material is mainly composed of reinforced concrete. However, this lining concrete will crack if it does not have sufficient strength. Such cracks will aggravate internal reinforced material rust, impacting the tunnel's safety and waterproofness. Once a highway tunnel has been in operation for 2 years, cracks become apparent. To assess the cracks, highway tunnel construction was investigated, and the causes were analysed on convergence of tunnel section, material strength test and numerical simulation. Possible factors in the design, construction and operation stages were also researched, such as partial pressure; material strength and engineering geology. The concept of quality management in the whole process is proposed. In addition, it is crucial to choose the appropriate materials to reinforce in a timely manner, to avoid too much cracking and ensure long-term stability. The research results have great significance for the safety control and management of highway tunnels. © 2015 W. S. Maney & Son Ltd.
引用
收藏
页码:144 / 147
相关论文
共 50 条
  • [41] FIBRE REINFORCED CONCRETE FOR TUNNEL LINING SEGMENT
    Racek, Vaclav
    Vodicka, Jan
    Kratky, Jiri
    Hilar, Matous
    19TH CZECH CONCRETE DAY 2012 / 19 BETONARSKE DNY 2012, 2012, : 336 - 341
  • [42] Evolution of humidity in simulated tunnel lining concrete
    Qian, C. (cxqian@seu.edu.cn), 1600, Southeast University (43):
  • [43] Permeability model of cracked tunnel lining concrete
    Institute of Geotechnical Engineering, Chongqing Jiaotong University, Chongqing 400074, China
    不详
    不详
    Tiedao Xuebao/Journal of the China Railway Society, 2008, 30 (02): : 124 - 127
  • [44] Curing precast concrete tunnel lining segments
    Brugger, Martin
    Concrete International, 1994, 16 (07) : 51 - 54
  • [45] CONTINUOUS SPRAYED CONCRETE TUNNEL LINING.
    Ryan, T.F.
    Tunnels and Tunnelling, 1973, 5 (06): : 542 - 543
  • [46] Concrete tunnel lining fire resistance and protection
    Chen, W.
    North American Tunneling 2006, 2006, : 209 - 214
  • [47] Analyses on structural stability of fiber concrete tunnel lining considering different characteristics of cracks under train loads
    Zhang Z.
    Zhang M.
    Feng J.
    Ma W.
    Wang Z.
    Cheng Z.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2022, 41 : 2927 - 2943
  • [48] Study on cracks of reinforced concrete lining of hydraulic tunnel under the combined action of water pressure and temperature load
    Su K.
    Wang B.
    Wang W.
    Zhu H.
    2020, Huazhong University of Science and Technology (48): : 114 - 120
  • [49] Design Reason Analysis and Control for Steel Reinforced Concrete Floor's Cracks
    Guo Weitong
    Shi Rongfen
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, 2011, : 360 - 363
  • [50] Reliability Evaluation for Tunnel Lining with Cracks Based on Extension Theory
    Xue, XiaoHui
    Su, ZhongMing
    Sun, ZhiJie
    Song, Fei
    MODERN TECHNOLOGIES IN MATERIALS, MECHANICS AND INTELLIGENT SYSTEMS, 2014, 1049 : 201 - 204