Integrating optimization method for continuous berth and quay crane scheduling in container terminals

被引:0
|
作者
机构
[1] Gui, Xiao-Ya
[2] Lu, Zhi-Qiang
[3] Han, Xiao-Le
来源
Lu, Z.-Q. (zhiqianglu@tongji.edu.cn) | 1600年 / Shanghai Jiaotong University卷 / 47期
关键词
6;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    Transportation Research Part E: Logistics and Transportation Review, 2022, 168
  • [32] Optimal Quay Crane Assignment and Scheduling in Port's Container Terminals
    Al-Refaie, Abbas
    Abedalqader, Hala
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2021, 15 (02): : 153 - 167
  • [33] The Joint quay crane scheduling and block allocation problem in container terminals
    Hu, Hongtao
    Chen, Xiazhong
    Zhen, Lu
    Ma, Chengle
    Zhang, Xiaotian
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2019, 30 (01) : 51 - 75
  • [34] Integrating berth allocation and quay crane assignments
    Chang, Daofang
    Jiang, Zuhua
    Yan, Wei
    He, Junliang
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (06) : 975 - 990
  • [35] Heuristics for quay crane scheduling at indented berth
    Chen, Jiang Hang
    Lee, Der-Horng
    Cao, Jin Xin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) : 1005 - 1020
  • [36] A crane scheduling method for port container terminals
    Kim, KH
    Park, YM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) : 752 - 768
  • [37] CONTINUOUS DYNAMIC BERTH ALLOCATION STRATEGY BASING ON QUAY-CRANE SCHEDULING
    Chen, Jinlong
    Xu, Ziqi
    FIFTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER THEORY AND ENGINEERING (ICACTE 2012), 2012, : 211 - 221
  • [38] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [39] Quay crane scheduling with non-interference constraints in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (01) : 124 - 135
  • [40] An approximation algorithm for quay crane scheduling with handling priority in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (12) : 1151 - 1161