Joint Long-term and Short-term Energy Storage Planning for New Power System Considering Supply and Demand Balance of Flexibility

被引:0
|
作者
Liu, Lijun [1 ,2 ]
Huang, Weidong [1 ]
Chen, Zekai [1 ]
Jiang, Yiqing [1 ]
Huang, Junqiang [1 ]
Chen, Feixiong [1 ,2 ]
机构
[1] College of Electrical Engineering and Automation, Fuzhou University, Fujian Province, Fuzhou,350108, China
[2] Key Laboratory of Energy Digitalization, Fuzhou University, Fujian Province, Fuzhou,350108, China
来源
关键词
D O I
10.13335/j.1000-3673.pst.2024.0224
中图分类号
学科分类号
摘要
28
引用
收藏
页码:4908 / 4917
相关论文
共 50 条
  • [41] PLANNING FOR LONG-TERM PROCESSES, NOT FOR SHORT-TERM BUDGET GOALS
    HOLLANDER, S
    NACHRICHTEN FUR DOKUMENTATION, 1995, 46 (02): : 79 - 82
  • [42] HAS LONG-TERM PLANNING HURT SHORT-TERM CAPACITY
    MCELROY, J
    AUTOMOTIVE INDUSTRIES, 1984, 164 (04): : 24 - 24
  • [43] Drought mitigation: Short-term vigilance, long-term planning
    Smith, K
    Svoboda, M
    Wood, SW
    10TH CONFERENCE ON APPLIED CLIMATOLOGY, 1997, : 94 - 94
  • [44] OPTIMAL OPERATION OF A HYDROELECTRIC POWER SYSTEM - LONG-TERM AND SHORT-TERM ASPECTS
    GARCIA, JM
    TURGEON, A
    RAIRO-AUTOMATIQUE-SYSTEMS ANALYSIS AND CONTROL, 1981, 15 (03): : 243 - 262
  • [45] WHEN LONG-TERM LEARNING DEPENDS ON SHORT-TERM STORAGE
    BADDELEY, A
    PAPAGNO, C
    VALLAR, G
    JOURNAL OF MEMORY AND LANGUAGE, 1988, 27 (05) : 586 - 595
  • [46] SHORT-TERM AND LONG-TERM STORAGE OF VIABLE OYSTER SPERM
    VANDERHORST, G
    DOTT, HM
    SAMUELS, JS
    GENADE, A
    SOUTH AFRICAN JOURNAL OF SCIENCE, 1985, 81 (07) : 404 - 405
  • [47] SHORT-TERM PLANNING OF HYBRID POWER SYSTEM
    Knezevic, Goran
    Baus, Zoran
    Nikolovski, Srete
    JOURNAL OF ELECTRICAL ENGINEERING-ELEKTROTECHNICKY CASOPIS, 2016, 67 (04): : 234 - 245
  • [48] Tailored Benders Decomposition for a Long-Term Power Expansion Model with Short-Term Demand Response
    Lohmann, Timo
    Rebennack, Steffen
    MANAGEMENT SCIENCE, 2017, 63 (06) : 2027 - 2048
  • [49] Flexibility Resource and Demand Balance Mechanism in Power System Planning Considering High Penetration of Renewable Energy
    Li, Haibo
    Lu, Zongxiang
    Qiao, Ying
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [50] LONG-TERM PLANNING VERSUS SHORT-TERM PLANNING IN THE ASYMPTOTICAL LOCATION PROBLEM
    Brancolini, Alessio
    Buttazzo, Giuseppe
    Santambrogio, Filippo
    Stepanov, Eugene
    ESAIM-CONTROL OPTIMISATION AND CALCULUS OF VARIATIONS, 2009, 15 (03): : 509 - 524