共 50 条
- [41] PLANNING FOR LONG-TERM PROCESSES, NOT FOR SHORT-TERM BUDGET GOALS NACHRICHTEN FUR DOKUMENTATION, 1995, 46 (02): : 79 - 82
- [42] HAS LONG-TERM PLANNING HURT SHORT-TERM CAPACITY AUTOMOTIVE INDUSTRIES, 1984, 164 (04): : 24 - 24
- [43] Drought mitigation: Short-term vigilance, long-term planning 10TH CONFERENCE ON APPLIED CLIMATOLOGY, 1997, : 94 - 94
- [44] OPTIMAL OPERATION OF A HYDROELECTRIC POWER SYSTEM - LONG-TERM AND SHORT-TERM ASPECTS RAIRO-AUTOMATIQUE-SYSTEMS ANALYSIS AND CONTROL, 1981, 15 (03): : 243 - 262
- [47] SHORT-TERM PLANNING OF HYBRID POWER SYSTEM JOURNAL OF ELECTRICAL ENGINEERING-ELEKTROTECHNICKY CASOPIS, 2016, 67 (04): : 234 - 245
- [49] Flexibility Resource and Demand Balance Mechanism in Power System Planning Considering High Penetration of Renewable Energy 2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
- [50] LONG-TERM PLANNING VERSUS SHORT-TERM PLANNING IN THE ASYMPTOTICAL LOCATION PROBLEM ESAIM-CONTROL OPTIMISATION AND CALCULUS OF VARIATIONS, 2009, 15 (03): : 509 - 524